Case No. |
Subject |
Date |
1969 |
Case No. 31 of 2024
Inland Power Limited (IPL) Vrs. JBVNL & Ors |
Approval of Capital Cost for installation of bed ash handling and conveying system with construction of dry ash dumping pond for 1*63 MW Coal Fired CFBC Thermal Power Project |
25.10.2024 |
1968 |
Case No. 30 of 2024
Inland Power Limited (IPL) |
Review of order dated 22.07.2024 w.r.t True-up for FY 2022-23 |
25.10.2024 |
1967 |
Case No. 29 of 2024
M/s Eastern Coalfields Limited Vrs. Jharkhand Urja Sancharan Nigam Limited & Ors |
For direction upon the Respondent JUSNL to release the claim amount of Rs.32.97 Cr. which is the 80% of the operations & Maintenance (O&M) cost borned by the petitioner upto April 2015 |
25.10.2024 |
1966 |
Case No. 21 of 2024
M/s Tata Power Company Limited Vrs. Tata Steel Limited (TSL) |
Review of order dated 06.06.2024 passed by JSERC in Case (T) No. 11of 2023 for true-up for the FY 2022-23 and APR for FY 2023-24 with respect to unit 2 & 3 (2x120 MW) of Jojobera Power Plant of Tata Power Company Limited (TPCL) |
25.10.2024 |
1965 |
Case No. 19 of 2024
M/s Royal Instrument India Pvt. Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Seeking necessary approval to take H.T. Connection on 33 KV line from JBVNL having contract demand of 450 KVA. |
25.10.2024 |
1964 |
Case No. 14 of 2024
Inland Power Limited (IPL) |
Review of order dated 26.02.2024 regarding True-up for FY 2021-22 |
25.10.2024 |
1963 |
Case No 10 of 2024
Amalgam Steel & Power Limited (ASPL) Vrs. JREDA |
For seeking direction that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) |
25.10.2024 |
1962 |
Case No. 09 of 2024
Amalgam Steel & Power Limited (ASPL) Vrs. JREDA |
For seekingdirection that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) from/for the year 2019-20 and 2020-21. |
25.10.2024 |
1961 |
Case No. 08 of 2024
M/s Grasim Industry Limited Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Non-compliance of the order/direction dated 16.05.2023 passed by this Commission in Case No. 26 of 2020 |
25.10.2024 |
1960 |
Case No. 03 of 2024
Tata Steel Limited (TSL) |
Review of the order dated 31.10.2023 passed in Case No. 30 of 2020 |
25.10.2024 |
1959 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. JUVNL & Ors |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
25.10.2024 |
1958 |
Case No.12 of 2019 (Tariff)
Inland Power Limited |
On the order dated 22.09.2020 passed in Case (T) No. 12 of 2019 for the Trueup of FY 2018-19 |
25.10.2024 |
1957 |
28 of 2024
N.T.P.C Ltd. Vrs. JBVNL |
Seeking approval for taking E.H.T connection on 220 KV line from the respondent for contract demand of 2000 KVA. |
27.09.2024 |
1956 |
Case No. 18 of 2024
Damodar Valley Corporation (DVC) Versus
Green Valley ReneGreen Valley Renewable Energy Limited (GVREL) |
Damodar Valley Corporation (DVC) and Green Valley Renewable Energy Limited (GVREL) has submitted an affidavited petition purported to be filed under clause 6.29 of JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 for approval of power purchase agreement (PPA) between Damodar Valley Corporation and Green Valley Renewable Energy limited for purchase of 310 MW solar power by DVC. |
27.09.2024 |
1955 |
Suo-Moto Case No. 02 of 2024
The Commission on its motion Versus 1.Jharkhand Bijli Vitran Nigam Limited 2.Jharkhand Urja Sancharan Nigam Limited & 3.The Secretary, Forest Deptt. Govt. of Jharkhand, Doranda |
Death of Elephants in Chakulia area due to Electrocution |
27.09.2024 |
1954 |
28 of 2024
N.T.P.C Ltd. Vrs. JBVNL |
Seeking approval for taking E.H.T connection on 220 KV line from the respondent for contract demand of 2000 KVA. |
24.09.2024 |
1953 |
27 of 2024
M/s Ramkrishna Forgings Limited Vrs. Jharkhanb Bijli Vitran Nigam Limited |
Non-compliance of direction passed by Ld. VUSNF Chaibasa at Jamshedpur |
24.09.2024 |
1952 |
26 of 2024
Tata Steel Limited |
Review of order dt. 26/06/2024 in Case No. 08 of 2023 for True-up for FY 2022-23 , APR for FY 2023-24 and ARR & Tariff for FY 2024-25 |
24.09.2024 |
1951 |
25 of 2024
Tata Steel Utilities and Infrastructure Services Limited |
Review of order dated 26.06.2024 passed by this Commission in Case (Tariff) No.09 of 2023 for true up for FY 2022-23, Annual Performance Review of FY 2023-24 and Aggregate Revenue Requirements & Tariff for FY 2024-25 |
24.09.2024 |
1950 |
24 of 2024
M/s ESL Steel Ltd. Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Exemption in compliance of Renewable Purchase Obligation for the period FY 2019-20 on the ground that the electricity produced from captive co- generating units of the petitioner is far in excess of its RPO requirements |
24.09.2024 |
1949 |
23 of 2024
M/s ESL Steel Ltd. Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Exemption in compliance of Renewable Purchase Obligation for the period FY 2018-19 on the ground that the electricity produced from captive co- generating units of the petitioner is far in excess of its RPO requirements |
24.09.2024 |
1948 |
22 of 2024
M/s ESL Steel Ltd. Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Exemption in compliance of Renewable Purchase Obligation for the period FY 2020-21 on the ground that the electricity produced from captive co- generating units of the petitioner is far in excess of its RPO requirements |
24.09.2024 |
1947 |
21 of 2024
M/s Tata Power Company Limited Vrs. Tata Steel Limited (TSL) |
Review of order dated 06.06.2024 passed by JSERC in Case (T) No. 11of 2023 for true-up for the FY 2022-23 and APR for FY 2023-24 with respect to unit 2 & 3 (2x120 MW) of Jojobera Power Plant of Tata Power Company Limited (TPCL) |
24.09.2024 |
1946 |
Case No. 19 of 2024
M/s Royal Instrument India Private Limited Versus Jharkhand Bijli Vitran Nigam Limited & Anr. |
Seeking necessary approval to take H.T. Connection on 33 KV line from JBVNL having contract demand of 450 KVA. |
24.09.2024 |
1945 |
10 of 2024
Amalgam Steel & Power Limited (ASPL) Vrs. JREDA |
For seeking direction that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) |
24.09.2024 |
1944 |
09 of 2024
Amalgam Steel & Power Limited (ASPL) Vrs. JREDA |
For seekingdirection that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) from/for the year 2019-20 and 2020-21. |
24.09.2024 |
1943 |
04 of 2024
Tata Power Company Limited (TPCL) Vrs. Tata Steel Limited (TSL)
|
Review of order dated 09.01.2024 regarding True-up for FY 2021-22, Annual Performance Review for FY 2021-22, Annual Performance Review for FY 2022-23 with respect to Unit-2 & 3 (2x120 MW) of Jojobera Power Plant of the Tata Power Company Limited (TPCL) |
24.09.2024 |
1942 |
17 of 2022
Inland Power Limited (IPL) Vrs. JUVNL & Ors |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
20.09.2024 |
1941 |
14 of 2024
Inland Power Limited (IPL) |
Review of order dated 26.02.2024 regarding True-up for FY 2021-22 |
20.09.2024 |
1940 |
12 of 2019
Inland Power Limited |
On the order dated 22.09.2020 passed in Case (T) No. 12 of 2019 for the Trueup of FY 2018-19 |
20.09.2024 |
1939 |
03 of 2024
Tata Steel Limited (TSL) |
Review of the order dated 31.10.2023 passed in Case No. 30 of 2020 |
20.09.2024 |
1938 |
30 of 2024
Inland Power Limited (IPL) |
Review of order dated 22.07.2024 w.r.t True-up for FY 2022-23 |
20.09.2024 |
1937 |
29 of 2024
M/s Eastern Coalfields Limited Vrs. Jharkhand Urja Sancharan Nigam Limited & Ors |
For direction upon the Respondent JUSNL to release the claim amount of Rs.32.97 Cr. which is the 80% of the operations & Maintenance (O&M) cost borned by the petitioner upto April 2015 |
20.09.2024 |
1936 |
18 of 2024
Damodar Valley Corporation (DVC) Versus
Green Valley ReneGreen Valley Renewable Energy Limited (GVREL) |
Damodar Valley Corporation (DVC) and Green Valley Renewable Energy Limited (GVREL) has submitted an affidavited petition purported to be filed under clause 6.29 of JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 for approval of power purchase agreement (PPA) between Damodar Valley Corporation and Green Valley Renewable Energy limited for purchase of 310 MW solar power by DVC. |
02.08.2024 |
1935 |
14 of 2024
Inland Power Limited (IPL)
Versus
Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 26.02.2024 regarding True-up for FY 2021-22 |
02.08.2024 |
1934 |
08 of 2024
M/s Grasim Industry Limited Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Non-compliance of the order/direction dated 16.05.2023 passed by this Commission in Case No. 26 of 2020 |
02.08.2024 |
1933 |
Suo-Moto Case No. 02 of 2024
The Commission on its motion Versus 1.Jharkhand Bijli Vitran Nigam Limited 2.Jharkhand Urja Sancharan Nigam Limited & 3.The Secretary, Forest Deptt. Govt. of Jharkhand, Doranda |
Death of Elephants in Chakulia area due to Electrocution |
02.08.2024 |
1932 |
28 of 2023
Tata Steel Long Products Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to be filed under Section 86 (1)(f) of the Electricity Act 2003 read with clause A-13.12 of JSERC (Electricity Supply Code) Regulations 2015 & Clause A-45 of the JSERC (Conduct of Business) Regulations, 2016 interalia for direction upon the respondents to take a time bound decision upon the request made by the Petitioner seeking HT Industrial connection from the earlier CPP arrangement as contained in the letter dated 06.12.2022 effective from 01.07.2023 onwards for its steel plant at Gamharia |
02.08.2024 |
1931 |
Case No. 03 of 2024
Tata Steel Limited
Versus
Damodar Val Damodar Valley Corporation & Ors. |
Review of the order dated 31.10.2023 passed in Case No. 30 of 2020 |
02.08.2024 |
1930 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
02.08.2024 |
1929 |
Case No. 19 of 2024
M/s Royal Instrument India Private Limited Versus Jharkhand Bijli Vitran Nigam Limited & Anr. |
Seeking necessary approval to take H.T. Connection on 33 KV line from JBVNL having contract demand of 450 KVA. |
02.08.2024 |
1928 |
10 of 2024
Amalgam Steel & Power Limited (ASPL) Vrs. JREDA |
For seeking direction that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) |
01.08.2024 |
1927 |
09 of 2024
Amalgam Steel & Power Limited (ASPL) Vrs. JREDA |
For seekingdirection that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) from/for the year 2019-20 and 2020-21. |
01.08.2024 |
1926 |
04 of 2024
Tata Power Company Limited (TPCL) Vrs. Tata Steel Limited (TSL) |
Review of order dated 09.01.2024 regarding True-up for FY 2021-22, Annual Performance Review for FY 2021-22, Annual Performance Review for FY 2022-23 with respect to Unit-2 & 3 (2x120 MW) of Jojobera Power Plant of the Tata Power Company Limited (TPCL) |
01.08.2024 |
1925 |
28 of 2023
Tata Steel Long Products Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Sub - Petition purported to be filed under Section 86 (1)(f) of the Electricity Act 2003 read with clause A-13.12 of JSERC (Electricity Supply Code) Regulations 2015 & Clause A-45 of the JSERC (Conduct of Business) Regulations, 2016 interalia for direction upon the respondents to take a time bound decision upon the request made by the Petitioner seeking HT Industrial connection from the earlier CPP arrangement as contained in the letter dated 06.12.2022 effective from 01.07.2023 onwards for its steel plant at Gamharia. |
01.08.2024 |
1924 |
21 of 2024
M/s Tata Power Company Limited Vrs. Tata Steel Limited (TSL) |
Review of order dated 06.06.2024 passed by JSERC in Case (T) No. 11of 2023 for true-up for the FY 2022-23 and APR for FY 2023-24 with respect to unit 2 & 3 (2x120 MW) of Jojobera Power Plant of Tata Power Company Limited (TPCL) |
01.08.2024 |
1923 |
Case No. 17 of 2023
Adhunik Power and Natural resources Ltd. (APNRL) Versus Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela
Kharsawan District in the State of Jharkhand. |
15.07.2024 |
1922 |
Case No. 23 of 2020 & MP No. 01 of 2022
Jharkhand Bijli Vitran Nigam Limited Versus Jharkhand Small Industries Association (JSIA) |
Review of JSERC Tariff order for true up for FY 2018-19, Aggregate Revenue Requirement and Tariff for FY 2020-21 for JBVNL. |
08.07.2024 |
1921 |
Case No. 37 of 2023
Pasari Steel Pvt. Limited Versus Jharkhand Bijli Vitran Nigam Limited (JBVNL) & Ors |
Direction upon the Respondents to comply with the order dated 22.04.2008 passed by the learned CGRF, Ranchi in Case No.04/08 affirmed by the order dated 30.08.2008 passed by the Electricity Ombudsman in Case No. EOJ/17/2008 and to refund the amount with interest forthwith in so far ase in some cases amounts have already been released by adjusting the amount against KVA charges. |
08.07.2024 |
1920 |
Case (Tariff) No. 09 of 2020
Damodary Valley Corporation (DVC)
Versus
Association of DVC HT Consumers of Jharkhand & Ors. |
Determination of Consumer Category-wise tariff for the period 2006-07 to FY 2011-12 for distribution and retail supply of Electricity for the post of the Damodar Valley Area failing within the teritory of the state of Jharkhand. |
28.06.2024 |
1919 |
05 of 2024
M/s Gajanan Ferro Pvt. Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
For getting/retaining the existing 33 KV supply of power with enhanced contract demand of 24000 KVA |
28.06.2024 |
1918 |
Case No. 18 of 2024
Damodar Valley Corporation (DVC) Versus
Green Valley ReneGreen Valley Renewable Energy Limited (GVREL) |
Damodar Valley Corporation (DVC) and Green Valley Renewable Energy Limited (GVREL) has submitted an affidavited petition purported to be filed under clause 6.29 of JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 for approval of power purchase agreement (PPA) between Damodar Valley Corporation and Green Valley Renewable Energy limited for purchase of 310 MW solar power by DVC. |
28.06.2024 |
1917 |
Suo-Moto Case No. 02 of 2024
The Commission on its motion Versus 1.Jharkhand Bijli Vitran Nigam Limited 2.Jharkhand Urja Sancharan Nigam Limited & 3.The Secretary, Forest Deptt. Govt. of Jharkhand, Doranda |
Death of Elephants in Chakulia area due to Electrocution |
21.06.2024 |
1916 |
14 of 2024
Inland Power Limited (IPL) |
Review of order dated 26.02.2024 regarding True-up for FY 2021-22 |
21.06.2024 |
1915 |
08 of 2024
M/s Grasim Industry Limited Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Non-compliance of the order/direction dated 16.05.2023 passed by this Commission in Case No. 26 of 2020 |
21.06.2024 |
1914 |
Case No. 03 of 2024
Tata Steel Limited
Versus
Damodar Val Damodar Valley Corporation & Ors.s |
Review of the order dated 31.10.2023 passed in Case No. 30 of 2020 |
21.06.2024 |
1913 |
28 of 2023
Tata Steel Long Products Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to be filed under Section 86 (1)(f) of the Electricity Act 2003 read with clause A-13.12 of JSERC (Electricity Supply Code) Regulations 2015 & Clause A-45 of the JSERC (Conduct of Business) Regulations, 2016 interalia for direction upon the respondents to take a time bound decision upon the request made by the Petitioner seeking HT Industrial connection from the earlier CPP arrangement as contained in the letter dated 06.12.2022 effective from 01.07.2023 onwards for its steel plant at Gamharia |
21.06.2024 |
1912 |
Case No. 17 of 2022
Inland Power Limited (IPL) Versus Jharkhand Urja Vikas Nigam Limited (JUVNL)& Ors |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
21.06.2024 |
1911 |
05 of 2024
M/s Gajanan Ferro Pvt. Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
For getting/retaining the existing 33 KV supply of power with enhanced contract demand of 24000 KVA |
04.06.2024 |
1910 |
Case No. 15 of 2024
M/s Dayton Grains Pvt. Ltd. Vrs. JUVNL & Ors |
For seeking necessary approval to take new service H.T connection from JBVNL at supply voltage of 33 kv having 700 KVA contract demand |
04.06.2024 |
1909 |
06 of 2024
M/s Khetan Enterprises Vrs. Jharkhand Bijli Vitran Nigam Limited & Another |
For seeking necessary approval to take allow it to take HT Connection at contract demand of 500 KVA to 600 KVA on 33 KV line from JBVNL. |
04.06.2024 |
1908 |
Case No. 10 of 2024
Amalgam Steel & Power Limited (ASPL)
Versus
Jharkhand Renewable Energy Development |
For seeking direction that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) |
04.06.2024 |
1907 |
Case No. 09 of 2024
Amalgam Steel & Power Limited (ASPL)
Versus
Jharkhand Renewable Energy Development |
For seeking direction that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) from/for the year 2019-20 and 2020-21. |
04.06.2024 |
1906 |
Case (Tariff) No. 09 of 2020
Damodary Valley Corporation (DVC)
Versus
Association of DVC HT Consumers of Jharkhand & Ors. |
Determination of Consumer Category-wise tariff for the period 2006-07 to FY 2011-12 for distribution and retail supply of Electricity for the post of the Damodar Valley Area failing within the teritory of the state of Jharkhand. |
24.05.2024 |
1905 |
Case No. 14 of 2024
Inland Power Limited (IPL)
Versus
Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 26.02.2024 regarding True-up for FY 2021-22 |
24.05.2024 |
1904 |
28 of 2023
Tata Steel Long Products Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to be filed under Section 86 (1)(f) of the Electricity Act 2003 read with clause A-13.12 of JSERC (Electricity Supply Code) Regulations 2015 & Clause A-45 of the JSERC (Conduct of Business) Regulations, 2016 interalia for direction upon the respondents to take a time bound decision upon the request made by the Petitioner seeking HT Industrial connection from the earlier CPP arrangement as contained in the letter dated 06.12.2022 effective from 01.07.2023 onwards for its steel plant at Gamharia |
24.05.2024 |
1903 |
15 of 2024
M/s Dayton Grains Pvt. Ltd. Vrs. JUVNL & Ors |
For seeking necessary approval to take new service H.T connection from JBVNL at supply voltage of 33 kv having 700 KVA contract demand |
24.05.2024 |
1902 |
17 of 2024
Tata Steel Utilities and Infrastructure Services Limited (TSUISL) |
For approval of proposed changes required to be implemented in existing Distribution Tariff Regulations |
17.05.2024 |
1901 |
Suo-Moto Case No. 02 of 2024
The Commission on its motion Versus 1.Jharkhand Bijli Vitran Nigam Limited 2.Jharkhand Urja Sancharan Nigam Limited & 3.The Secretary, Forest Deptt. Govt. of Jharkhand, Doranda |
Death of Elephants in Chakulia area due to Electrocution |
17.05.2024 |
1900 |
16 of 2024
Rajyash Agro Pvt. Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited |
For approval to take new service H.T.Connection from JBVNL at supply voltage of 33 KV having 800 KVA contract demand |
17.05.2024 |
1899 |
06 of 2024
M/s Khetan Enterprises Vrs. Jharkhand Bijli Vitran Nigam Limited & Another |
For seeking necessary approval to take allow it to take HT Connection at contract demand of 500 KVA to 600 KVA on 33 KV line from JBVNL. |
17.05.2024 |
1898 |
05 of 2024
M/s Gajanan Ferro Pvt. Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
For getting/retaining the existing 33 KV supply of power with enhanced contract demand of 24000 KVA |
17.05.2024 |
1897 |
28 of 2023
Tata Steel Long Products Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to be filed under Section 86 (1)(f) of the Electricity Act 2003 read with clause A-13.12 of JSERC (Electricity Supply Code) Regulations 2015 & Clause A-45 of the JSERC (Conduct of Business) Regulations, 2016 interalia for direction upon the respondents to take a time bound decision upon the request made by the Petitioner seeking HT Industrial connection from the earlier CPP arrangement as contained in the letter dated 06.12.2022 effective from 01.07.2023 onwards for its steel plant at Gamharia |
17.05.2024 |
1896 |
08 of 2024
M/s Grasim Industry Limited Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Non-compliance of the order/direction dated 16.05.2023 passed by this Commission in Case No. 26 of 2020 |
17.05.2024 |
1895 |
Case No. 15 of 2024
M/s Dayton Grains Pvt. Ltd. Vrs. JUVNL & Ors |
For seeking necessary approval to take new service H.T connection from JBVNL at supply voltage of 33 kv having 700 KVA contract demand |
17.05.2024 |
1894 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
17.05.2024 |
1893 |
01 of 2022
SAIL, Bokaro Steel Plant Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
17.05.2024 |
1892 |
36 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2020-21 |
17.05.2024 |
1891 |
35 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2019-20 |
17.05.2024 |
1890 |
34 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemptioin from RPO for FY 2018-19 |
17.05.2024 |
1889 |
33 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2017-18 |
17.05.2024 |
1888 |
32 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2016-17 |
17.05.2024 |
1887 |
31 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2015-16 |
17.05.2024 |
1886 |
30 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2014-15 |
17.05.2024 |
1885 |
29 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2013-14 |
17.05.2024 |
1884 |
37 of 2023
Pasari Steel Pvt. Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Direction upon the Respondents to comply with the order dated 22.04.2008 passed by the learned CGRF, Ranchi in Case No.04/08 affirmed by the order dated 30.08.2008 passed by the Electricity Ombudsman in Case No. EOJ/17/2008 and to refund the amount with interest forthwith in so far ase in some cases amounts have already been released by adjusting the amount against KVA charges. |
14.05.2024 |
1883 |
Case No. 17 of 2023
Adhunik Power and Natural resources Ltd. (APNRL) Versus Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela
Kharsawan District in the State of Jharkhand. |
14.05.2024 |
1882 |
Case No. 14 of 2024
Inland Power Limited (IPL)
Versus
Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 26.02.2024 regarding True-up for FY 2021-22 |
10.05.2024 |
1881 |
Case No. 04 of 2024
Tata Power Company Limited. Versus
Tata Steel Limited |
Review of order dated 09.01.2024 regarding True-up for FY 2021-22, Annual Performance Review for FY 2021-22, Annual Performance Review for FY 2022-23 with respect to Unit-2 & 3 (2x120 MW) of Jojobera Power Plant of the Tata Power Company Limited (TPCL) |
10.05.2024 |
1880 |
Case No. 03 of 2024
Tata Steel Limited
Versus
Damodar Val Damodar Valley Corporation & Ors. |
Review of the order dated 31.10.2023 passed in Case No. 30 of 2020 |
10.05.2024 |
1879 |
Case No. 27 of 2023
AMP Energy C & I Fifteen Private Limited Versus Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition under section 86 (1)(c) & (e) & (k) of the Electricity Act, 2003 read with regulation 55.3 of the Jharkhand State Electricity Regulatory Commission (Conduct of Business) Regulations, 2016 seeking appropriate reliefs/directions vis a vis the Jharkhand State Solar Policy, 2022 for supply of solar power from its under developing captive solar project. |
10.05.2024 |
1878 |
Case (Tariff) No. 09 of 2020
Damodary Valley Corporation (DVC)
Versus
Association of DVC HT Consumers of Jharkhand & Ors. |
Determination of Consumer Category-wise tariff for the period 2006-07 to FY 2011-12 for distribution and retail supply of Electricity for the post of the Damodar Valley Area failing within the teritory of the state of Jharkhand. |
10.05.2024 |
1877 |
Case No. 10 of 2024
Amalgam Steel & Power Limited (ASPL)
Versus
Jharkhand Renewable Energy Development |
For seeking direction that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) |
10.05.2024 |
1876 |
Case No. 09 of 2024
Amalgam Steel & Power Limited (ASPL)
Versus
Jharkhand Renewable Energy Development |
For seeking direction that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) from/for the year 2019-20 and 2020-21. |
10.05.2024 |
1875 |
Suo-Moto Case No. 02 of 2024
The Commission on its motion Versus 1.Jharkhand Bijli Vitran Nigam Limited 2.Jharkhand Urja Sancharan Nigam Limited & 3.The Secretary, Forest Deptt. Govt. of Jharkhand, Doranda |
Death of Elephants in Chakulia area due to Electrocution |
09.05.2024 |
1874 |
Case No. 15 of 2024
M/s Dayton Grains Pvt. Ltd. Vrs. JUVNL & Ors |
For seeking necessary approval to take new service H.T connection from JBVNL at supply voltage of 33 kv having 700 KVA contract demand |
30.04.2024 |
1873 |
08 of 2024
M/s Grasim Industry Limited Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Non-compliance of the order/direction dated 16.05.2023 passed by this Commission in Case No. 26 of 2020 |
30.04.2024 |
1872 |
06 of 2024
M/s Khetan Enterprises Vrs. Jharkhand Bijli Vitran Nigam Limited & Another |
For seeking necessary approval to take allow it to take HT Connection at contract demand of 500 KVA to 600 KVA on 33 KV line from JBVNL. |
30.04.2024 |
1871 |
28 of 2023
Tata Steel Long Products Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to be filed under Section 86 (1)(f) of the Electricity Act 2003 read with clause A-13.12 of JSERC (Electricity Supply Code) Regulations 2015 & Clause A-45 of the JSERC (Conduct of Business) Regulations, 2016 interalia for direction upon the respondents to take a time bound decision upon the request made by the Petitioner seeking HT Industrial connection from the earlier CPP arrangement as contained in the letter dated 06.12.2022 effective from 01.07.2023 onwards for its steel plant at Gamharia |
30.04.2024 |
1870 |
05 of 2024
M/s Gajanan Ferro Pvt. Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
For getting/retaining the existing 33 KV supply of power with enhanced contract demand of 24000 KVA |
30.04.2024 |
1869 |
16 of 2024
Rajyash Agro Pvt. Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited |
For approval to take new service H.T.Connection from JBVNL at supply voltage of 33 KV having 800 KVA contract demand |
30.04.2024 |
1868 |
12 of 2024
Inland Power Limited Vrs. Jharkhand Bijli Vitran Nigam Limited |
For approval of 5th Supplementary Power Purchase Agreement (PPA) under Shakti Scheme B-II Round VI for 110100 tons of Coal |
19.04.2024 |
1867 |
11 of 2024
Adhunik Power and Natural Resources Limited Vrs. Jharkhand Bijli Vitran Nigam Limited |
For approval of the Draft Addendum no.04 to the PPA dated 28.09.2012 to be executed between JBVNL and APNRL in terms of the sixth round of auction of coal linkages under paragraph b(ii) of the shakti policy 2017 |
19.04.2024 |
1866 |
36 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2020-21 |
19.04.2024 |
1865 |
35 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2019-20 |
19.04.2024 |
1864 |
34 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemptioin from RPO for FY 2018-19 |
19.04.2024 |
1863 |
33 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2017-18 |
19.04.2024 |
1862 |
32 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2016-17 |
19.04.2024 |
1861 |
31 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2015-16 |
19.04.2024 |
1860 |
30 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2014-15 |
19.04.2024 |
1859 |
29 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2013-14 |
19.04.2024 |
1858 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
19.04.2024 |
1857 |
01 of 2022
SAIL, Bokaro Steel Plant Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
19.04.2024 |
1856 |
Case (Tariff) No. 09 of 2020 Damodar Valley Corporation (DVC) |
Determination of Consumer Category-wise tariff for the period 2006-07 to FY 2011-12 for distribution and retail supply of Electricity for the post of the Damodar Valley Area failing within the teritory of the state of Jharkhand. |
16.04.2024 |
1855 |
37 of 2023
Pasari Steel Pvt. Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Direction upon the Respondents to comply with the order dated 22.04.2008 passed by the learned CGRF, Ranchi in Case No.04/08 affirmed by the order dated 30.08.2008 passed by the Electricity Ombudsman in Case No. EOJ/17/2008 and to refund the amount with interest forthwith in so far ase in some cases amounts have already been released by adjusting the amount against KVA charges. |
16.04.2024 |
1854 |
17 of 2023
Adhunik Power and Natural Resources Limited Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela
Kharsawan District in the State of Jharkhand. |
16.04.2024 |
1853 |
14 of 2024
Inland Power Limited (IPL) |
Review of order dated 26.02.2024 regarding True-up for FY 2021-22 |
16.04.2024 |
1852 |
13 of 2024
Jharkhand Urja Utpadan Nigam Limited |
Review of order dated 26.02.2024 regarding True-up for FY 2016-17 to FY 2020-21 & Business Plan, Tariff,MYT tariff petition for control period FY 21-22 to FY 25-26. |
16.04.2024 |
1851 |
Suo-Moto Case No. 02 of 2024
The Commission on its motion Versus 1.Jharkhand Bijli Vitran Nigam Limited 2.Jharkhand Urja Sancharan Nigam Limited & 3.The Secretary, Forest Deptt. Govt. of Jharkhand, Doranda |
Death of Elephants in Chakulia area due to Electrocution |
16.04.2024 |
1850 |
Case No. 15 of 2024
M/s Dayton Grains Pvt. Ltd. Vrs. JUVNL & Ors |
For seeking necessary approval to take new service H.T connection from JBVNL at supply voltage of 33 kv having 700 KVA contract demand |
02.04.2024 |
1849 |
Case (Tariff) No. 09 of 2020 Damodar Valley Corporation (DVC) |
Determination of Consumer Category-wise tariff for the period 2006-07 to FY 2011-12 for distribution and retail supply of Electricity for the post of the Damodar Valley Area failing within the teritory of the state of Jharkhand. |
02.04.2024 |
1848 |
12 of 2024
Inland Power Limited Vrs. Jharkhand Bijli Vitran Nigam Limited |
For approval of 5th Supplementary Power Purchase Agreement (PPA) under Shakti Scheme B-II Round VI for 110100 tons of Coal |
02.04.2024 |
1847 |
11 of 2024
Adhunik Power and Natural Resources Limited Vrs. Jharkhand Bijli Vitran Nigam Limited |
For approval of the Draft Addendum no.04 to the PPA dated 28.09.2012 to be executed between JBVNL and APNRL in terms of the sixth round of auction of coal linkages under paragraph b(ii) of the shakti policy 2017 |
02.04.2024 |
1846 |
08 of 2024
M/s Grasim Industry Limited Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Non-compliance of the order/direction dated 16.05.2023 passed by this Commission in Case No. 26 of 2020 |
02.04.2024 |
1845 |
07 of 2024
Tata Steel Utilities and Infrastructure Services Limited (TSUISL) |
Approval of capital expenditure for " Installation of 1x80/100 MVA 132/33 KV transformer and related interconnecting switchgears for TGS substation" related to network augmentation, safety & reliability by the Licensee Tata Steel UISL |
02.04.2024 |
1844 |
06 of 2024
M/s Khetan Enterprises Vrs. Jharkhand Bijli Vitran Nigam Limited & Another |
For seeking necessary approval to take allow it to take HT Connection at contract demand of 500 KVA to 600 KVA on 33 KV line from JBVNL. |
02.04.2024 |
1843 |
05 of 2024
M/s Gajanan Ferro Pvt. Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
For getting/retaining the existing 33 KV supply of power with enhanced contract demand of 24000 KVA |
02.04.2024 |
1842 |
38 of 2023
Steel Authority of India Ltd. Vrs. Damodar Valley Corporation |
Petition filed under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 41.1 of the JSERC (Conduct of Business) Regulations, 2016 for review of order dt. 12/06/2023 passed in Case No. 29 of 2020 along with application under section 5 of the limitation Act, 1963 for condonation of delay of 43 days is filing the review petition. |
02.04.2024 |
1841 |
23 of 2020 & Miscellaneous Petition No 01 of 2022
Jharkhand Small Industries Association (JSIA) Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Review of JSERC Tariff order for true up for FY 2018-19, Aggregate Revenue Requirement and Tariff for FY 2020-21 for JBVNL. |
02.04.2024 |
1840 |
28 of 2023
Tata Steel Long Products Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Direction upon the respondents to take a time bound decision upon the request made by the Petitioner seeking HT Industrial connection from the earlier CPP arrangement as contained in the letter dated 06.12.2022 effective from 01.07.2023 onwards for its steel plant at Gamharia. |
02.04.2024 |
1839 |
Case No. 27 of 2023
AMP Energy C & I Fifteen Private Limited Versus Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition under section 86 (1)(c) & (e) & (k) of the Electricity Act, 2003 read with regulation 55.3 of the Jharkhand State Electricity Regulatory Commission (Conduct of Business) Regulations, 2016 seeking appropriate reliefs/directions vis a vis the Jharkhand State Solar Policy, 2022 for supply of solar power from its under developing captive solar project. |
02.04.2024 |
1838 |
Suo-Moto Case No. 02 of 2024
The Commission on its motion Versus 1.Jharkhand Bijli Vitran Nigam Limited 2.Jharkhand Urja Sancharan Nigam Limited & 3.The Secretary, Forest Deptt. Govt. of Jharkhand, Doranda |
Death of Elephants in Chakulia area due to Electrocution |
15.03.2024 |
1837 |
37 of 2023
Pasari Steel Pvt. Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Direction upon the Respondents to comply with the order dated 22.04.2008 passed by the learned CGRF, Ranchi in Case No.04/08 affirmed by the order dated 30.08.2008 passed by the Electricity Ombudsman in Case No. EOJ/17/2008 and to refund the amount with interest forthwith in so far ase in some cases amounts have already been released by adjusting the amount against KVA charges. |
15.03.2024 |
1836 |
Case No. 17 of 2023
Adhunik Power and Natural resources Ltd. (APNRL) Versus Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela Kharsawan District in the State of Jharkhand. |
15.03.2024 |
1835 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
15.03.2024 |
1834 |
01 of 2022
SAIL, Bokaro Steel Plant Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
15.03.2024 |
1833 |
Case No. 04 of 2024
Tata Power Company Limited. Versus
Tata Steel Limited |
Review of order dated 09.01.2024 regarding True-up for FY 2021-22, Annual Performance Review for FY 2021-22, Annual Performance Review for FY 2022-23 with respect to Unit-2 & 3 (2x120 MW) of Jojobera Power Plant of the Tata Power Company Limited (TPCL) |
15.03.2024 |
1832 |
Case No. 03 of 2024
Tata Steel Limited
Versus
Damodar Val Damodar Valley Corporation & Ors. |
Review of the order dated 31.10.2023 passed in Case No. 30 of 2020 |
15.03.2024 |
1831 |
36 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2020-21 |
15.03.2024 |
1830 |
35 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2019-20 |
15.03.2024 |
1829 |
34 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemptioin from RPO for FY 2018-19 |
15.03.2024 |
1828 |
33 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2017-18 |
15.03.2024 |
1827 |
32 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2016-17 |
15.03.2024 |
1826 |
31 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2015-16 |
15.03.2024 |
1825 |
30 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2014-15 |
15.03.2024 |
1824 |
29 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2013-14 |
15.03.2024 |
1823 |
38 of 2023
Steel Authority of India Ltd. Vrs. Damodar Valley Corporation |
Petition filed under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 41.1 of the JSERC (Conduct of Business) Regulations, 2016 for review of order dt. 12/06/2023 passed in Case No. 29 of 2020 along with application under section 5 of the limitation Act, 1963 for condonation of delay of 43 days is filing the review petition. |
20.02.2024 |
1822 |
23 of 2020 & Miscellaneous Petition No 01 of 2022
Jharkhand Small Industries Association (JSIA) Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Review of JSERC Tariff order for true up for FY 2018-19, Aggregate Revenue Requirement and Tariff for FY 2020-21 for JBVNL. |
20.02.2024 |
1821 |
28 of 2023
Tata Steel Long Products Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Direction upon the respondents to take a time bound decision upon the request made by the Petitioner seeking HT Industrial connection from the earlier CPP arrangement as contained in the letter dated 06.12.2022 effective from 01.07.2023 onwards for its steel plant at Gamharia. |
20.02.2024 |
1820 |
36 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2020-21 |
20.02.2024 |
1819 |
35 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2019-20 |
20.02.2024 |
1818 |
34 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemptioin from RPO for FY 2018-19 |
20.02.2024 |
1817 |
33 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2017-18 |
20.02.2024 |
1816 |
32 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2016-17 |
20.02.2024 |
1815 |
31 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2015-16 |
20.02.2024 |
1814 |
30 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2014-15 |
20.02.2024 |
1813 |
29 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2013-14 |
20.02.2024 |
1812 |
01 of 2022
SAIL, Bokaro Steel Plant Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
20.02.2024 |
1811 |
Case No. 09 of 2019
M/s Vananchal Steel Alloys Private Limited Versus Damodar Valley Corporation & another |
Order on Case No. 09 of 2019 |
20.02.2024 |
1810 |
Case No. 27 of 2023
AMP Energy C & I Fifteen Private Limited Versus Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition under section 86 (1)(c) & (e) & (k) of the Electricity Act, 2003 read with regulation 55.3 of the Jharkhand State Electricity Regulatory Commission (Conduct of Business) Regulations, 2016 seeking appropriate reliefs/directions vis a vis the Jharkhand State Solar Policy, 2022 for supply of solar power from its under developing captive solar project. |
20.02.2024 |
1809 |
Adjudicate Case No. 01 of 2023/ Case No.15 of 2023
The Bureau of Energy Efficiency
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
Petition filed under section 27 of the Energy Conservation Act, 2001 for adjudication of the penalty under Section 26 of the Energy Conservatin Act, 2001 by the Adujdication office and for directions to Jharkhand Bijli Vitran Nigam Limited to make payment as adjuicated by the Adjudicating officer. |
09.02.2024 |
1808 |
38 of 2023
Steel Authority of India Ltd. Vrs. Damodar Valley Corporation |
Petition filed under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 41.1 of the JSERC (Conduct of Business) Regulations, 2016 for review of order dt. 12/06/2023 passed in Case No. 29 of 2020 along with application under section 5 of the limitation Act, 1963 for condonation of delay of 43 days is filing the review petition. |
06.02.2024 |
1807 |
37 of 2023
Pasari Steel Pvt. Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Direction upon the Respondents to comply with the order dated 22.04.2008 passed by the learned CGRF, Ranchi in Case No.04/08 affirmed by the order dated 30.08.2008 passed by the Electricity Ombudsman in Case No. EOJ/17/2008 and to refund the amount with interest forthwith in so far ase in some cases amounts have already been released by adjusting the amount against KVA charges. |
06.02.2024 |
1806 |
23 of 2023
Inland Power Limited |
For review of order dated 22.05.2023 regarding Truing up for FY 2020-21 of Inland Power Limited |
06.02.2024 |
1805 |
Case No. 17 of 2023
Adhunik Power and Natural resources Ltd. (APNRL) Versus Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela Kharsawan District in the State of Jharkhand. |
06.02.2024 |
1804 |
Suo-Moto Case No. 02 of 2024
The Commission on its motion Versus 1.Jharkhand Bijli Vitran Nigam Limited 2.Jharkhand Urja Sancharan Nigam Limited & 3.The Secretary, Forest Deptt. Govt. of Jharkhand, Doranda |
Death of Elephants in Chakulia area due to Electrocution |
06.02.2024 |
1803 |
Case No. 03 of 2024
Tata Steel Limited
Versus
Damodar Val Damodar Valley Corporation & Ors. |
Review of the order dated 31.10.2023 passed in Case No. 30 of 2020 |
06.02.2024 |
1802 |
Miscellaneous Petition No. 05 of 2023
Jharkhand Bijli Vitran Nigam Limited |
An affidavitated miscellaneous petition purported to be filed under Section 61, 86 and Section 181 of the Electricity Act 2003 for formulation of Regulatioin on installation and implementation of Prepaid Smart Metering in the State of Jharkhand |
06.02.2024 |
1801 |
01 of 2024
M/s Inland Power Limited (IPL)
Vrs.
Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
For approval of draft 4th supplementary Power Purchase Agreement dated 23.02.2012 signed between JBVNL & M/s Inland Power Limited |
24.01.2024 |
1800 |
Adjudicate Case No. 01 of 2023/ Case No.15 of 2023
The Bureau of Energy Efficiency
Vrs.
Jharkhand Bijli Vitran Nigam Limited
|
Petition filed under section 27 of the Energy Conservation Act, 2001 for adjudication of the penalty under Section 26 of the Energy Conservatin Act, 2001 by the Adujdication office and for directions to Jharkhand Bijli Vitran Nigam Limited to make payment as adjuicated by the Adjudicating officer. |
24.01.2024 |
1799 |
Case No. 23 of 2020 & MP No. 01 of 2022
Jharkhand Bijli Vitran Nigam Limited Versus Jharkhand Small Industries Association (JSIA) |
Review of JSERC Tariff order for true up for FY 2018-19, Aggregate Revenue Requirement and Tariff for FY 2020-21 for JBVNL. |
19.01.2024 |
1798 |
36 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2020-21 |
16.01.2024 |
1797 |
35 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2019-20 |
16.01.2024 |
1796 |
34 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemptioin from RPO for FY 2018-19 |
16.01.2024 |
1795 |
33 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2017-18 |
16.01.2024 |
1794 |
32 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2016-17 |
16.01.2024 |
1793 |
31 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2015-16 |
16.01.2024 |
1792 |
30 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2014-15 |
16.01.2024 |
1791 |
29 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2013-14 |
16.01.2024 |
1790 |
Case No. 01 of 2022
SAIL, Bokaro Steel Plant
Versus
Jharkhand Renewable Energy Development Agency (JREDA) |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
16.01.2024 |
1789 |
28 of 2023
Tata Steel Long Products Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Direction upon the respondents to take a time bound decision upon the request made by the Petitioner seeking HT Industrial connection from the earlier CPP arrangement as contained in the letter dated 06.12.2022 effective from 01.07.2023 onwards for its steel plant at Gamharia. |
16.01.2024 |
1788 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
16.01.2024 |
1787 |
Case No. 09 of 2019
M/s Vananchal Steel Alloys Private Limited Versus Damodar Valley Corporation & another |
Order on Case No. 09 of 2019 |
16.01.2024 |
1786 |
Case No. 27 of 2023
AMP Energy C & I Fifteen Private Limited Versus Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition under section 86 (1)(c) & (e) & (k) of the Electricity Act, 2003 read with regulation 55.3 of the Jharkhand State Electricity Regulatory Commission (Conduct of Business) Regulations, 2016 seeking appropriate reliefs/directions vis a vis the Jharkhand State Solar Policy, 2022 for supply of solar power from its under developing captive solar project. |
12.01.2024 |
1785 |
23 of 2023
Inland Power Limited |
For review of order dated 22.05.2023 regarding Truing up for FY 2020-21 of Inland Power Limited |
12.01.2024 |
1784 |
Case No.21 of 2023
Jharkhand Urja Sancharan Nigam Limited |
Review of order dated 23.06.2023 for True up for FY 2019-20 and Business Plan & Multi Year Tariff for the Control Period FY 2021-22 to FY 2025-26 |
12.01.2024 |
1783 |
19 of 2023
Jharkhand Urja Sancharan Nigam Limited (JUSNL) |
Review of order dated 12.06.2023 for True up for FY 2017-18 |
12.01.2024 |
1782 |
Case No. 17 of 2023
Adhunik Power and Natural resources Ltd. (APNRL)
Versus
Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela
Kharsawan District in the State of Jharkhand. |
12.01.2024 |
1781 |
06 of 2023
M/s Usha Martin Limited Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition purported to be filed under Regulation clause A10 (Dispute Resolution) and A11 (Power to Remove Difficulties) of JSERC (Utilization of surplus Capacity of Captive Power Plants based on conventional fuel) Regulations 2010 |
12.01.2024 |
1780 |
Miscellaneous Petition No. 05 of 2023
Jharkhand Bijli Vitran Nigam Limited |
An affidavitated miscellaneous petition purported to be filed under Section 61, 86 and Section 181 of the Electricity Act 2003 for formulation of Regulatioin on installation and implementation of Prepaid Smart Metering in the State of Jharkhand |
12.01.2024 |
1779 |
Case No. 16 of 2022
M/s Rungta Mines Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition filed under section 86 of the Electricity Act 2003 read alongwith Clause 10.6, 39.1 and 41.1 of the JSERC (Terms and Conditions for Intra State Open Access), Regulations 2016 seeking necessary directioin by upon the Distribution licensee namely, JBVNL to take necessary steps to consider the case of the petitoner for grant of no objection in connection with sale of power/energy in an open market regulated by CERC and administered by NOAR |
12.01.2024 |
1778 |
23 of 2020 & Miscellaneous Petition No 01 of 2022
Jharkhand Small Industries Association (JSIA) Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Review of JSERC Tariff order for true up for FY 2018-19, Aggregate Revenue Requirement and Tariff for FY 2020-21 for JBVNL. |
12.01.2024 |
1777 |
Case No.43 of 2023
M/s Tata Steel Utilities and Infrastructure Services Limited |
For approval of Capital Expenditure for three schemes related to Network Extension/Augmentation and Reliability (Emergency requirement) |
12.01.2024 |
1776 |
Case No. 01 of 2024
M/s Inland Power Limited (IPL) Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
For approval of draft 4th supplementary Power Purchase Agreement dated 23.02.2012 signed between JBVNL & M/s Inland Power Limited |
12.01.2024 |
1775 |
Adjudicate Case No. 01 of 2023/Case No. 15 of 2023
The Bureau of Energy Efficiency Versus Jharkhand Bijli Vitran Nigam Limited |
Petition filed under section 27 of the Energy Conservation Act, 2001 for adjudication of the penalty under Section 26 of the Energy Conservatin Act, 2001 by the Adujdication office and for directions to Jharkhand Bijli Vitran Nigam Limited to make payment as adjuicated by the Adjudicating officer. |
09.01.2024 |
1774 |
Case No. 41 of 2023
Jharkhand Urja Sancharan Nigam Limited
Versus
Patratu Vidyut UtPatratu Vidyut Utpadan Nigam Limited (PVUNL)& Ors. |
Petition in compliance of order dated 10.10.2023 and 03.11.2023 passed in case no.21 of 2023 for approval of evacuation of Power from Patratu Vidyut Utpadan Nigam Limited (PVUNL) |
01.12.2023 |
1773 |
Case No.21 of 2023
Jharkhand Urja Sancharan Nigam Limited |
Review of order dated 23.06.2023 for True up for FY 2019-20 and Business Plan & Multi Year Tariff for the Control Period FY 2021-22 to FY 2025-26 |
01.12.2023 |
1772 |
28 of 2023
Tata Steel Long Products Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Direction upon the respondents to take a time bound decision upon the request made by the Petitioner seeking HT Industrial connection from the earlier CPP arrangement as contained in the letter dated 06.12.2022 effective from 01.07.2023 onwards for its steel plant at Gamharia. |
01.12.2023 |
1771 |
37 of 2023
Pasari Steel Pvt. Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Direction upon the Respondents to comply with the order dated 22.04.2008 passed by the learned CGRF, Ranchi in Case No.04/08 affirmed by the order dated 30.08.2008 passed by the Electricity Ombudsman in Case No. EOJ/17/2008 and to refund the amount with interest forthwith in so far ase in some cases amounts have already been released by adjusting the amount against KVA charges. |
01.12.2023 |
1770 |
42 of 2023 |
Review of order dated 29.09.2023 for True up for FY 2020-21 and order dated 29.09.2023 for True up for 2021-22, APR for FY 2022-23 and ARR & Tariff for FY 2023-24 |
01.12.2023 |
1769 |
40 of 2023
Swarnrekha Rice Mill Pvt. Ltd. Vrs. JBVNL & Ors. |
Necessary approval of the Commission in taking new service H.T connection at supply voltage of of 33 KV having 800 KVA contract demand from JBVNL |
01.12.2023 |
1768 |
38 of 2023
Steel Authority of India Ltd. Vrs. Damodar Valley Corporation |
Petition filed under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 41.1 of the JSERC (Conduct of Business) Regulations, 2016 for review of order dt. 12/06/2023 passed in Case No. 29 of 2020 along with application under section 5 of the limitation Act, 1963 for condonation of delay of 43 days is filing the review petition. |
01.12.2023 |
1767 |
Case No. 16 of 2022
M/s Rungta Mines Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition filed under section 86 of the Electricity Act 2003 read alongwith Clause 10.6, 39.1 and 41.1 of the JSERC (Terms and Conditions for Intra State Open Access), Regulations 2016 seeking necessary directioin by upon the Distribution licensee namely, JBVNL to take necessary steps to consider the case of the petitoner for grant of no objection in connection with sale of power/energy in an open market regulated by CERC and administered by NOAR |
01.12.2023 |
1766 |
06 of 2023
M/s Usha Martin Limited Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition purported to be filed under Regulation clause A10 (Dispute Resolution) and A11 (Power to Remove Difficulties) of JSERC (Utilization of surplus Capacity of Captive Power Plants based on conventional fuel) Regulations 2010 |
01.12.2023 |
1765 |
Case No. 27 of 2023
AMP Energy C & I Fifteen Private Limited Versus Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition under section 86 (1)(c) & (e) & (k) of the Electricity Act, 2003 read with regulation 55.3 of the Jharkhand State Electricity Regulatory Commission (Conduct of Business) Regulations, 2016 seeking appropriate reliefs/directions vis a vis the Jharkhand State Soloar Policy, 2022 for supply of solar power from its under developing captive solar project. |
30.11.2023 |
1764 |
Case No. 05 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no 01 of 2021 regarding determination of ARR for the MYT period from FY 2021-22 to 2025-26 and Tariff for FY 2021-22 |
30.11.2023 |
1763 |
Case No. 04 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no. 11 of 2020 regarding True-up for FY 2019-20. |
30.11.2023 |
1762 |
19 of 2023
Jharkhand Urja Sancharan Nigam Limited (JUSNL) |
Review of order dated 12.06.2023 for True up for FY 2017-18 |
28.11.2023 |
1761 |
Adjudicate Case No. 01 of 2023/Case No. 15 of 2023
The Bureau of Energy Efficiency Versus Jharkhand Bijli Vitran Nigam Limited |
Petition filed under section 27 of the Energy Conservation Act, 2001 for adjudication of the penalty under Section 26 of the Energy Conservatin Act, 2001 by the Adujdication office and for directions to Jharkhand Bijli Vitran Nigam Limited to make payment as adjuicated by the Adjudicating officer. |
28.11.2023 |
1760 |
Case No. 41 of 2023
Jharkhand Urja Sancharan Nigam Limited
Versus
Patratu Vidyut UtPatratu Vidyut Utpadan Nigam Limited (PVUNL)& Ors. |
Petition in compliance of order dated 10.10.2023 and 03.11.2023 passed in case no.21 of 2023 for approval of evacuation of Power from Patratu Vidyut Utpadan Nigam Limited (PVUNL) |
28.11.2023 |
1759 |
Case No.21 of 2023
Jharkhand Urja Sancharan Nigam Limited |
Review of order dated 23.06.2023 for True up for FY 2019-20 and Business Plan & Multi Year Tariff for the Control Period FY 2021-22 to FY 2025-26 |
28.11.2023 |
1758 |
Case No. 17 of 2023
Adhunik Power and Natural resources Ltd. (APNRL)
Versus
Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela
Kharsawan District in the State of Jharkhand. |
28.11.2023 |
1757 |
Miscellaneous Petition No. 05 of 2023
Jharkhand Bijli Vitran Nigam Limited |
An affidavitated miscellaneous petition purported to be filed under Section 61, 86 and Section 181 of the Electricity Act 2003 for formulation of Regulatioin on installation and implementation of Prepaid Smart Metering in the State of Jharkhand |
28.11.2023 |
1756 |
23 of 2023
Inland Power Limited |
For review of order dated 22.05.2023 regarding Truing up for FY 2020-21 of Inland Power Limited |
24.11.2023 |
1755 |
25 of 2023
Aadhar Rice Mill Pvt. Ltd Vrs. Jharkhand Bijli Vitran Nigam Limited & Ors |
Inter-alia for allowing the petitioner to take H.T connections from JBVNL at supply voltage of 33 KV having 600 KVA contract demand for Aadhar Rice Mill Pvt. Ltd. |
22.11.2023 |
1754 |
23 of 2020 & Miscellaneous Petition No 01 of 2022
Jharkhand Small Industries Association (JSIA) Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Review of JSERC Tariff order for true up for FY 2018-19, Aggregate Revenue Requirement and Tariff for FY 2020-21 for JBVNL. |
22.11.2023 |
1753 |
19 of 2022
M/s Auto Profiles Limited Vrs. JBVNL & Ors |
Non-compliance of the judgement dated 19.02.2022 passed by the Consumer Grievance Redressal Forum, Chaibasa |
22.11.2023 |
1752 |
36 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2020-21 |
17.11.2023 |
1751 |
35 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2019-20 |
17.11.2023 |
1750 |
34 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemptioin from RPO for FY 2018-19 |
17.11.2023 |
1749 |
33 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2017-18 |
17.11.2023 |
1748 |
32 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2016-17 |
17.11.2023 |
1747; |
31 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2015-16 |
17.11.2023 |
1746 |
30 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2014-15 |
17.11.2023 |
1745 |
29 of 2023
Steel Authority of India Limited (SAIL) Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Subject - Exemption from RPO for FY 2013-14 |
17.11.2023 |
1744 |
28 of 2023
Tata Steel Long Products Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Direction upon the respondents to take a time bound decision upon the request made by the Petitioner seeking HT Industrial connection from the earlier CPP arrangement as contained in the letter dated 06.12.2022 effective from 01.07.2023 onwards for its steel plant at Gamharia. |
17.11.2023 |
1743 |
Case No. 01 of 2022
SAIL, Bokaro Steel Plant
Versus
Jharkhand Renewable Energy Development Agency (JREDA) |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
17.11.2023 |
1742 |
Case No. 09 of 2019
M/s Vananchal Steel Alloys Private Limited Versus Damodar Valley Corporation & another |
Order on Case No. 09 of 2019 |
17.11.2023 |
1741 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
17.11.2023 |
1740 |
37 of 2023
Pasari Steel Pvt. Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Direction upon the Respondents to comply with the order dated 22.04.2008 passed by the learned CGRF, Ranchi in Case No.04/08 affirmed by the order dated 30.08.2008 passed by the Electricity Ombudsman in Case No. EOJ/17/2008 and to refund the amount with interest forthwith in so far ase in some cases amounts have already been released by adjusting the amount against KVA charges. |
17.11.2023 |
1739 |
Case No. 28 of 2023
Tata Steel Long Products Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL)
|
Direction upon the respondents to take a time bound decision upon the request made by the Petitioner seeking HT Industrial connection from the earlier CPP arrangement as contained in the letter dated 06.12.2022 effective from 01.07.2023 onwards for its steel plant at Gamharia. |
17.11.2023 |
1738 |
Case No. 41 of 2023
Jharkhand Urja Sancharan Nigam Limited
Versus
Patratu Vidyut UtPatratu Vidyut Utpadan Nigam Limited (PVUNL)& Ors. |
Petition in compliance of order dated 10.10.2023 and 03.11.2023 passed in case no.21 of 2023 for approval of evacuation of Power from Patratu Vidyut Utpadan Nigam Limited (PVUNL) |
10.11.2023 |
1737 |
39 of 2023
Jharkhand Urja Sancharan Nigam Limited (JUSNL) |
Petition filed under clause 6.1 of the JSERC (Modalities of Tariff Determination) Regulations 2023 for approval of the Transmission project of the petitioner for providing quality power supply. |
10.11.2023 |
1736 |
Case No.21 of 2023
Jharkhand Urja Sancharan Nigam Limited |
Review of order dated 23.06.2023 for True up for FY 2019-20 and Business Plan & Multi Year Tariff for the Control Period FY 2021-22 to FY 2025-26 |
10.11.2023 |
1735 |
19 of 2023
Jharkhand Urja Sancharan Nigam Limited (JUSNL) |
Review of order dated 12.06.2023 for True up for FY 2017-18 |
10.11.2023 |
1734 |
25 of 2023
Aadhar Rice Mill Pvt. Ltd Vrs. Jharkhand Bijli Vitran Nigam Limited & Ors |
Inter-alia for allowing the petitioner to take H.T connections from JBVNL at supply voltage of 33 KV having 600 KVA contract demand for Aadhar Rice Mill Pvt. Ltd. |
10.11.2023 |
1733 |
23 of 2023
Inland Power Limited |
For review of order dated 22.05.2023 regarding Truing up for FY 2020-21 of Inland Power Limited |
10.11.2023 |
1732 |
19 of 2022
M/s Auto Profiles Limited Vrs. JBVNL & Ors |
Non-compliance of the judgement dated 19.02.2022 passed by the Consumer Grievance Redressal Forum, Chaibasa |
10.11.2023 |
1731 |
Case No. 17 of 2023
Adhunik Power and Natural resources Ltd. (APNRL)
Versus
Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela
Kharsawan District in the State of Jharkhand. |
10.11.2023 |
1730 |
23 of 2020 & Miscellaneous Petition No 01 of 2022
Jharkhand Small Industries Association (JSIA) Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to filed under Regulation 42 and 45 of JSERC (Conduct of Business) Regulations, 2016 challenging the maintainability of the Review petition being case no. 23 of of 2020 filed by JBVNL, which is filed under Section 94 of the Electricity Act 2003 and Regulations 41 (1) (2) & (3) of the JSERC (Conduct of Business) Regulations, 2016 for review of JSERC Tariff order for true up for FY 2018-19, Aggregate Revenue Requirement and Tariff for FY 2020-21 for JBVNL. |
10.11.2023 |
1729 |
Miscellaneous Petition No. 05 of 2023
Jharkhand Bijli Vitran Nigam Limited |
An affidavitated miscellaneous petition purported to be filed under Section 61, 86 and Section 181 of the Electricity Act 2003 for formulation of Regulatioin on installation and implementation of Prepaid Smart Metering in the State of Jharkhand |
10.11.2023 |
1728 |
Case No. 04 of 2020
M/s Gautam Ferro Alloys Vrs. Jharkhand Bijli Vitran Nigam Ltd. & Ors. |
Order on Case No. 04 of 2020 |
10.11.2023 |
1727 |
39 of 2023
Jharkhand Urja Sancharan Nigam Limited (JUSNL) |
Petition filed under clause 6.1 of the JSERC (Modalities of Tariff Determination) Regulations 2023 for approval of the Transmission project of the petitioner for providing quality power supply. |
09.11.2023 |
1726 |
Case No.21 of 2023
Jharkhand Urja Sancharan Nigam Limited |
Review of order dated 23.06.2023 for True up for FY 2019-20 and Business Plan & Multi Year Tariff for the Control Period FY 2021-22 to FY 2025-26 |
09.11.2023 |
1725 |
19 of 2023
Jharkhand Urja Sancharan Nigam Limited (JUSNL) |
Review of order dated 12.06.2023 for True up for FY 2017-18 |
09.11.2023 |
1724 |
Case No. 41 of 2023
Jharkhand Urja Sancharan Nigam Limited
Versus
Patratu Vidyut UtPatratu Vidyut Utpadan Nigam Limited (PVUNL)& Ors. |
Petition in compliance of order dated 10.10.2023 and 03.11.2023 passed in case no.21 of 2023 for approval of evacuation of Power from Patratu Vidyut Utpadan Nigam Limited (PVUNL) |
09.11.2023 |
1723 |
38 of 2023
Steel Authority of India Ltd. Vrs. Damodar Valley Corporation |
Petition filed under Section 94 (1) (f) of the Electricity Act, 2003 read with Regulation 41.1 of the JSERC (Conduct of Business) Regulations, 2016 for review of order dt. 12/06/2023 passed in Case No. 29 of 2020 along with application under section 5 of the limitation Act, 1963 for condonation of delay of 43 days is filing the review petition. |
03.11.2023 |
1722 |
39 of 2023
Jharkhand Urja Sancharan Nigam Limited (JUSNL) |
Petition filed under clause 6.1 of the JSERC (Modalities of Tariff Determination) Regulations 2023 for approval of the Transmission project of the petitioner for providing quality power supply. |
03.11.2023 |
1721 |
40 of 2023
Swarnrekha Rice Mill Pvt. Ltd. Vrs. JBVNL & Ors. |
Necessary approval of the Commission in taking new service H.T connection at supply voltage of of 33 KV having 800 KVA contract demand from JBVNL |
03.11.2023 |
1720 |
Case No.21 of 2023
Jharkhand Urja Sancharan Nigam Limited |
Review of order dated 23.06.2023 for True up for FY 2019-20 and Business Plan & Multi Year Tariff for the Control Period FY 2021-22 to FY 2025-26 |
03.11.2023 |
1719 |
Case No. 16 of 2022
M/s Rungta Mines Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition filed under section 86 of the Electricity Act 2003 read alongwith Clause 10.6, 39.1 and 41.1 of the JSERC (Terms and Conditions for Intra State Open Access), Regulations 2016 seeking necessary directioin by upon the Distribution licensee namely, JBVNL to take necessary steps to consider the case of the petitoner for grant of no objection in connection with sale of power/energy in an open market regulated by CERC and administered by NOAR |
03.11.2023 |
1718 |
06 of 2023
M/s Usha Martin Limited Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition purported to be filed under Regulation clause A10 (Dispute Resolution) and A11 (Power to Remove Difficulties) of JSERC (Utilization of surplus Capacity of Captive Power Plants based on conventional fuel) Regulations 2010 |
03.11.2023 |
1717 |
19 of 2023
Jharkhand Urja Sancharan Nigam Limited (JUSNL) |
Review of order dated 12.06.2023 for True up for FY 2017-18 |
03.11.2023 |
1716 |
Case No. 23 of 2020
& MP No. 01 of 2022 |
Review petition on the order dated 01.10.2020 in Case (T) No. 13 of 2019 on the petition for true up for FY 2018-19, APR for FY 2019-20 and ARR Tariff for FY 2020-21 |
02.11.2023 |
1715 |
Case No. 05 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no 01 of 2021 regarding determinatin of ARR for the MYT period from FY 2021-22 to 2025-26 and Tariff for FY 2021-22 |
02.11.2023 |
1714 |
Case No. 04 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no. 11 of 2020 regarding True-up for FY 2019-20. |
02.11.2023 |
1713 |
19 of 2022
M/s Auto Profiles Limited Vrs. JBVNL & Ors |
Non-compliance of the judgement dated 19.02.2022 passed by the Consumer Grievance Redressal Forum, Chaibasa |
02.11.2023 |
1712 |
Case No. 15 of 2023
The Bureau of Energy Efficiency Versus Jharkhand Bijli Vitran Nigam Limited |
Petition filed under section 27 of the Energy Conservation Act, 2001 for adjudication of the penalty under Section 26 of the Energy Conservatin Act, 2001 by the Adujdication office and for directions to Jharkhand Bijli Vitran Nigam Limited to make payment as adjuicated by the Adjudicating officer. |
31.10.2023 |
1711 |
Case No. 17 of 2023
Adhunik Power and Natural resources Ltd. (APNRL)
Versus
Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela
Kharsawan District in the State of Jharkhand. |
10.10.2023 |
1710 |
Case No. 16 of 2022
M/s Rungta Mines Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition filed under section 86 of the Electricity Act 2003 read alongwith Clause 10.6, 39.1 and 41.1 of the JSERC (Terms and Conditions for Intra State Open Access), Regulations 2016 seeking necessary directioin by upon the Distribution licensee namely, JBVNL to take necessary steps to consider the case of the petitoner for grant of no objection in connection with sale of power/energy in an open market regulated by CERC and administered by NOAR |
10.10.2023 |
1709 |
37 of 2023
Pasari Steel Pvt. Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to be filed under clause 26 of JSERC (Guidelines for establishent of Forum for Redressal of Grievances of the Consumers and Electricity Ombudsman) Regulations, 2011 for a direction upon the Respondents to comply with the order dated 22.04.2008 passed by the learned CGRF, Ranchi in Case No.04/08 affirmed by the order dated 30.08.2008 passed by the Electricity Ombudsman in Case No. EOJ/17/2008 and to refund the amount with interest forthwith in so far ase in some cases amounts have already been released by adjusting the amount against KVA charges. |
10.10.2023 |
1708 |
23 of 2020 & Miscellaneous Petition No 01 of 2022
Jharkhand Small Industries Association (JSIA) Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to filed under Regulation 42 and 45 of JSERC (Conduct of Business) Regulations, 2016 challenging the maintainability of the Review petition being case no. 23 of of 2020 filed by JBVNL, which is filed under Section 94 of the Electricity Act 2003 and Regulations 41 (1) (2) & (3) of the JSERC (Conduct of Business) Regulations, 2016 for review of JSERC Tariff order for true up for FY 2018-19, Aggregate Revenue Requirement and Tariff for FY 2020-21 for JBVNL. |
10.10.2023 |
1707 |
Miscellaneous Petition No. 05 of 2023
Jharkhand Bijli Vitran Nigam Limited |
An affidavitated miscellaneous petition purported to be filed under Section 61, 86 and Section 181 of the Electricity Act 2003 for formulation of Regulatioin on installation and implementation of Prepaid Smart Metering in the State of Jharkhand |
10.10.2023 |
1706 |
26 of 2023
Jharkhand Bijli Vitran Nigam Limited Vrs. Tenughat Vidyut Nigam Limited |
Petition purported to be filed under clause 6.29 of JSERC (Term and Conditions for Determination of Distribution Tariff) Regulations 2020 for approval of Power Purchase Agreement (PPA) between Jharkhand Bijli Vitran Nigam Limited and Tenughat Vidyut Nigam Limited for purchase of 420 MW at the rate determined by JSERC for period of 10 (Ten) years. |
10.10.2023 |
1705 |
Case No.21 of 2023
Jharkhand Urja Sancharan Nigam Limited |
Review of order dated 23.06.2023 for True up for FY 2019-20 and Business Plan & Multi Year Tariff for the Control Period FY 2021-22 to FY 2025-26 |
10.10.2023 |
1704 |
37 of 2023
Pasari Steel Pvt. Ltd. Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to be filed under clause 26 of JSERC (Guidelines for establishent of Forum for Redressal of Grievances of the Consumers and Electricity Ombudsman) Regulations, 2011 for a direction upon the Respondents to comply with the order dated 22.04.2008 passed by the learned CGRF, Ranchi in Case No.04/08 affirmed by the order dated 30.08.2008 passed by the Electricity Ombudsman in Case No. EOJ/17/2008 and to refund the amount with interest forthwith in so far ase in some cases amounts have already been released by adjusting the amount against KVA charges. |
06.10.2023 |
1703 |
06 of 2023
M/s Usha Martin Limited Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition purported to be filed under Regulation clause A10 (Dispute Resolution) and A11 (Power to Remove Difficulties) of JSERC (Utilization of surplus Capacity of Captive Power Plants based on conventional fuel) Regulations 2010 |
06.10.2023 |
1702 |
23 of 2020 & Miscellaneous Petition No 01 of 2022
Jharkhand Small Industries Association (JSIA) Vrs. Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to filed under Regulation 42 and 45 of JSERC (Conduct of Business) Regulations, 2016 challenging the maintainability of the Review petition being case no. 23 of of 2020 filed by JBVNL, which is filed under Section 94 of the Electricity Act 2003 and Regulations 41 (1) (2) & (3) of the JSERC (Conduct of Business) Regulations, 2016 for review of JSERC Tariff order for true up for FY 2018-19, Aggregate Revenue Requirement and Tariff for FY 2020-21 for JBVNL. |
06.10.2023 |
1701 |
Miscellaneous Petition No. 05 of 2023
Jharkhand Bijli Vitran Nigam Limited |
An affidavitated miscellaneous petition purported to be filed under Section 61, 86 and Section 181 of the Electricity Act 2003 for formulation of Regulatioin on installation and implementation of Prepaid Smart Metering in the State of Jharkhand |
06.10.2023 |
1700 |
26 of 2023
Jharkhand Bijli Vitran Nigam Limited Vrs. Tenughat Vidyut Nigam Limited |
Petition purported to be filed under clause 6.29 of JSERC (Term and Conditions for Determination of Distribution Tariff) Regulations 2020 for approval of Power Purchase Agreement (PPA) between Jharkhand Bijli Vitran Nigam Limited and Tenughat Vidyut Nigam Limited for purchase of 420 MW at the rate determined by JSERC for period of 10 (Ten) years. |
06.10.2023 |
1699 |
Case No.21 of 2023
Jharkhand Urja Sancharan Nigam Limited |
Review of order dated 23.06.2023 for True up for FY 2019-20 and Business Plan & Multi Year Tariff for the Control Period FY 2021-22 to FY 2025-26 |
06.10.2023 |
1698 |
19 of 2023
Jharkhand Urja Sancharan Nigam Limited (JUSNL) |
Review of order dated 12.06.2023 for True up for FY 2017-18 |
06.10.2023 |
1697 |
Case No. 16 of 2022
M/s Rungta Mines Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition filed under section 86 of the Electricity Act 2003 read alongwith Clause 10.6, 39.1 and 41.1 of the JSERC (Terms and Conditions for Intra State Open Access), Regulations 2016 seeking necessary directioin by upon the Distribution licensee namely, JBVNL to take necessary steps to consider the case of the petitoner for grant of no objection in connection with sale of power/energy in an open market regulated by CERC and administered by NOAR |
06.10.2023 |
1696 |
04 of 2023
DVC Vrs. Association of the DVC HT Consumer of Jharkhand |
Review of order dated 30.01.2023 passed in Case (T) no. 11 of 2020 regarding True-up for FY 2019-20. |
03.10.2023 |
1695 |
05 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no 01 of 2021 regarding determinatin of ARR for the MYT period from FY 2021-22 to 2025-26 and Tariff for FY 2021-22 |
03.10.2023 |
1694 |
Case No. 17 of 2023
Adhunik Power and Natural resources Ltd. (APNRL)
Versus
Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela
Kharsawan District in the State of Jharkhand. |
26.09.2023 |
1693 |
19 of 2022
M/s Auto Profiles Limited Vrs. JBVNL & Ors |
Non-compliance of the judgement dated 19.02.2022 passed by the Consumer Grievance Redressal Forum, Chaibasa |
26.09.2023 |
1692 |
25 of 2023
Aadhar Rice Mill Pvt. Ltd Vrs. Jharkhand Bijli Vitran Nigam Limited & Ors |
Inter-alia for allowing the petitioner to take H.T connections from JBVNL at supply voltage of 33 KV having 600 KVA contract demand for Aadhar Rice Mill Pvt. Ltd. |
26.09.2023 |
1691 |
23 of 2023
Inland Power Limited |
For review of order dated 22.05.2023 regarding Truing up for FY 2020-21 of Inland Power Limited |
26.09.2023 |
1690 |
Case No. 16 of 2022
M/s Rungta Mines Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition filed under section 86 of the Electricity Act 2003 read alongwith Clause 10.6, 39.1 and 41.1 of the JSERC (Terms and Conditions for Intra State Open Access), Regulations 2016 seeking necessary directioin by upon the Distribution licensee namely, JBVNL to take necessary steps to consider the case of the petitoner for grant of no objection in connection with sale of power/energy in an open market regulated by CERC and administered by NOAR |
26.09.2023 |
1689 |
Case No. 05 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no 01 of 2021 regarding determinatin of ARR for the MYT period from FY 2021-22 to 2025-26 and Tariff for FY 2021-22 |
26.09.2023 |
1688 |
Case No. 04 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no. 11 of 2020 regarding True-up for FY 2019-20. |
26.09.2023 |
1687 |
Case No. 04 of 2020
M/s Gautam Ferro Alloys Vrs. Jharkhand Bijli Vitran Nigam Ltd. & Ors. |
Order on Case No. 04 of 2020 |
26.09.2023 |
1686 |
Case No. 15 of 2023
The Bureau of Energy Efficiency Versus Jharkhand Bijli Vitran Nigam Limited |
Petition filed under section 27 of the Energy Conservation Act, 2001 for adjudication of the penalty under Section 26 of the Energy Conservatin Act, 2001 by the Adujdication office and for directions to Jharkhand Bijli Vitran Nigam Limited to make payment as adjuicated by the Adjudicating officer. |
21.09.2023 |
1685 |
Case No. 06 of 2023
Association of DVC HT Consumers of Jharkhand Vrs. Damodar Valley Corporation (DVC) |
Submission of Review petition pertaining to revision of voltage rebate and subsequent issue of corrigendum against the Tariff order for Distribution Activity of Damodar Valley Corporation (DVC) in Jharkhand State- True up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 dated 30.09.2020 issued by Hon'ble JSERC |
12.09.2023 |
1684 |
Case No. 01 of 2022
SAIL, Bokaro Steel Plant
Versus
Jharkhand Renewable Energy Development Agency (JREDA) |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
12.09.2023 |
1683 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
12.09.2023 |
1682 |
Case No. 23 of 2020
& MP No. 01 of 2022 |
Review petition on the order dated 01.10.2020 in Case (T) No. 13 of 2019 on the petition for true up for FY 2018-19, APR for FY 2019-20 and ARR Tariff for FY 2020-21 |
12.09.2023 |
1681 |
09 of 2019
M/s Vananchal Steel Alloys (Pvt.) Ltd. Versus Damodar Valley Corporation (DVC) & Anr |
Order on Case No. 09 of 2019 |
12.09.2023 |
1680 |
Case No. 27 of 2023
AMP Energy C & I Fifteen Private Limited Versus Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition under section 86 (1)(c) & (e) & (k) of the Electricity Act, 2003 read with regulation 55.3 of the Jharkhand State Electricity Regulatory Commission (Conduct of Business) Regulations, 2016 seeking appropriate reliefs/directions vis a vis the Jharkhand State Soloar Policy, 2022 for supply of solar power from its under developing captive solar project. |
12.09.2023 |
1679 |
17 of 2023
Adhunik Power and Natural Resources Limited Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela Kharsawan District in the State of Jharkhand. |
29.08.2023 |
1678 |
19 of 2022
M/s Auto Profiles Limited Vrs. JBVNL & Ors |
Non-compliance of the judgement dated 19.02.2022 passed by the Consumer Grievance Redressal Forum, Chaibasa |
29.08.2023 |
1677 |
Case No.30 of 2020
Tata Steel Limited (TSL)
Vrs.
Damodar Valley Corporation (DVC) |
Order on Case No. 30 of 2020 |
28.08.2023 |
1676 |
Case No.30 of 2020
Tata Steel Limited (TSL)
Vrs.
Damodar Valley Corporation (DVC) |
Order on Case No. 30 of 2020 |
22.08.2023 |
1675 |
Case No.21 of 2023
Jharkhand Urja Sancharan Nigam Limited |
Review of order dated 23.06.2023 for True up for FY 2019-20 and Business Plan & Multi Year Tariff for the Control Period FY 2021-22 to FY 2025-26 |
18.08.2023 |
1674 |
Case No. 15 of 2023
The Bureau of Energy Efficiency Versus Jharkhand Bijli Vitran Nigam Limited |
Petition filed under section 27 of the Energy Conservation Act, 2001 for adjudication of the penalty under Section 26 of the Energy Conservatin Act, 2001 by the Adujdication office and for directions to Jharkhand Bijli Vitran Nigam Limited to make payment as adjuicated by the Adjudicating officer. |
18.08.2023 |
1672 |
09 of 2023
Jharkhand Bijli Vitran Nigam Limited (JBVNL) Vrs. Solar Energy Corporation of India Limited (SECI), New Delhi |
For approval of provisional Power Purchase Agreement (PPA) between Jharkhand Bijli Vitran Nigam Limited and Solar Energy Corporation of India Limited (SECI) for purchase of 100 MW floating solar power to be installed at Getalsud Dam by Solar Energy Corporation of India Limited (SECI) |
18.08.2023 |
1671 |
07 of 2023
M/s Sigma HTS LLP Vrs. Tata Steel Utilities and Infrastructure Services Ltd. |
Petition purported to be filed under section 62 (5) and (6) read with section 129 of the Electricity Act, 2003 inter-alia for issuance of a direction to TSUISL to grant appropriate voltage rebate in terms of tariff order 2021-22 published on 24.11.2022 effective from 01.12.2022 |
18.08.2023 |
1670 |
Case No.30 of 2020
Tata Steel Limited (TSL)
Vrs.
Damodar Valley Corporation (DVC) |
Order on Case No. 30 of 2020 |
18.08.2023 |
1669 |
Case No.30 of 2020
Tata Steel Limited (TSL)
Vrs.
Damodar Valley Corporation (DVC) |
Order on Case No. 30 of 2020 |
11.08.2023 |
1668 |
Case No. 17 of 2023
Adhunik Power and Natural resources Ltd. (APNRL)
Versus
Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela
Kharsawan District in the State of Jharkhand. |
04.08.2023 |
1667 |
Case No. 05 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no 01 of 2021 regarding determinatin of ARR for the MYT period from FY 2021-22 to 2025-26 and Tariff for FY 2021-22 |
04.08.2023 |
1666 |
Case No. 04 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no. 11 of 2020 regarding True-up for FY 2019-20. |
04.08.2023 |
1665 |
13 of 2023
Tenughat Vidyut Nigam Limited (TVNL) |
Petition purported to be filed under JSERC (Terms and Conditions for Determination of Generation Tariff) Regulations 2020 inter-alia in the clauses of Return on Equity as well as for alignment of depreciation rates as prescribed by Honble Central Electricity Regulatory Commision (CERC) |
04.08.2023 |
1664 |
12 of 2023
Tata Power Company Limited (TPCL) |
Petition purported to be filed under clause 32 & 33 of the JSERC (Terms and Conditions for Determination of Generation Tariff) Regulations 2020 read with clause 45 of the JSERC (Conduct of Business ) Regulations 2016 as well as Section 79(1) (b) of the Electricity Act 2003 seeking removal of difficulties/modification/amendment/review of provisions of JSERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2020. |
04.08.2023 |
1663 |
Case No. 03 of 2023
Inland Power Limited |
Petition for seeking amendment of the JSERC (Terms & Condition for determination of Generation Tariff) Regulation, 2020 under section 61 of the Electricity Act 2003 |
04.08.2023 |
1662 |
19 of 2022
M/s Auto Profiles Ltd. Versus Jharkhand Bijli Vitran Nigam Ltd. &Ors. |
Non-compliance of the judgement dated 19.02.2022 passed by the Consumer Grievance Redressal Forum, Chaibasa |
04.08.2023 |
1661 |
Case No. 16 of 2022
M/s Rungta Mines Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition filed under section 86 of the Electricity Act 2003 read alongwith Clause 10.6, 39.1 and 41.1 of the JSERC (Terms and Conditions for Intra State Open Access), Regulations 2016 seeking necessary directioin by upon the Distribution licensee namely, JBVNL to take necessary steps to consider the case of the petitoner for grant of no objection in connection with sale of power/energy in an open market regulated by CERC and administered by NOAR |
04.08.2023 |
1660 |
01 of 2022
SAIL, Bokaro Steel Plant Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Petition purported to be filed under Regulations 13 read 15.2 of the JSERC (Renewable Purchas Obligation and its compliance) Regulations 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
04.08.2023 |
1659 |
Miscellaneous Petition No. 04 of 2023
Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition for taking into consideration the milestones/deadlines set by the Revamped Distribution Sector Scheme (RDSS) |
04.08.2023 |
1658 |
19 of 2023
Jharkhand Urja Sancharan Nigam Limited (JUSNL) |
Review of order dated 12.06.2023 for True up for FY 2017-18 |
04.08.2023 |
1657 |
18 of 2023
Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Review of order dated 31.05.2023 passed in Case (T) 04 of 2020 for Trueup for FY 2019-20, Annual Performance Review for FY 2020-21 and Business Plan & MYT for control period from FY 2021-22 to FY 2025-26 and Tariff for FY 2021-22 |
04.08.2023 |
1656 |
09 of 2023
Jharkhand Bijli Vitran Nigam Limited (JBVNL) Vrs. Solar Energy Corporation of India Limited (SECI), New Delhi |
For approval of provisional Power Purchase Agreement (PPA) between Jharkhand Bijli Vitran Nigam Limited and Solar Energy Corporation of India Limited (SECI) for purchase of 100 MW floating solar power to be installed at Getalsud Dam by Solar Energy Corporation of India Limited (SECI) |
03.08.2023 |
1655 |
Case No. 23 of 2020
& MP No. 01 of 2022 |
Review petition on the order dated 01.10.2020 in Case (T) No. 13 of 2019 on the petition for true up for FY 2018-19, APR for FY 2019-20 and ARR Tariff for FY 2020-21 |
02.08.2023 |
1654 |
Case No. 04 of 2020
M/s Gautam Ferro Alloys Vrs. Jharkhand Bijli Vitran Nigam Ltd. & Ors. |
Order on Case No. 04 of 2020 |
02.08.2023 |
1653 |
11 of 2023
Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to be filed under JSERC (Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering) Regulations, 2015 inter-alia for amendment of maximum peak capaciity of the grid connected rooftop solar PV system to be installed by any eligible consumer or third party owner. |
01.08.2023 |
1652 |
09 of 2019
M/s Vananchal Steel Alloys (Pvt.) Ltd. Versus Damodar Valley Corporation (DVC) & Anr |
Order on Case No. 09 of 2019 |
01.08.2023 |
1651 |
Case No. 10 of 2023
M/s Dilip Buildcon Limited Vrs. Jharkhand Bijli Vitran Nigam Limited |
Petition purported under clause 4.7 of the (Electricity Supply Code), Regulations, 2015 inter-alia for allowing the petitioner to take new connection from JBVNL at supply voltage of 33 KV having 1000 KVA contract demand. |
01.08.2023 |
1650 |
Case No. 02 of 2023
Damodar Valley Corporation
Versus
Association of DVC HT Consumers of Jharkhand |
Damodar Valley Corporation (DVC) has submitted an affidavited petition purported to be filled under section 61 and 62 of the Electricity Act, 2003 read with Regulations 22.1 of JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations 2020 for amendment of clause 10.7 of JSERC (Terms and conditions for Determination of distribution Tariff) Regulations 2020 by which celling/capping of 10% variable component has been made for the recovery of FPPPA for the part of the Damodar Valley area falling within the territory of the state of
Jharkhand. |
01.08.2023 |
1649 |
08 of 2023
Damodar Valley Corporation |
Petition purported to be filed under section 62,64 & 86 of the Electricity Act, 2003 read with the applicable provisions of the DVC Act 1948, interalia for approval towards investment for creations of necessary infrastruture to provide supply of electricity to 11 KV Consumer in the state of Jharkhand by Damodar Valley Cororation in accordance with Regulation 6.12 of JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations 2020 as amended. |
01.08.2023 |
1648 |
07 of 2023
M/s Sigma HTS LLP Vrs. Tata Steel Utilities and Infrastructure Services Ltd. |
Petition purported to be filed under section 62 (5) and (6) read with section 129 of the Electricity Act, 2003 inter-alia for issuance of a direction to TSUISL to grant appropriate voltage rebate in terms of tariff order 2021-22 published on 24.11.2022 effective from 01.12.2022 |
01.08.2023 |
1647 |
Case No. 06 of 2023
Association of DVC HT Consumers of Jharkhand Vrs. Damodar Valley Corporation (DVC) |
Submission of Review petition pertaining to revision of voltage rebate and subsequent issue of corrigendum against the Tariff order for Distribution Activity of Damodar Valley Corporation (DVC) in Jharkhand State- True up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 dated 30.09.2020 issued by Hon'ble JSERC |
01.08.2023 |
1646 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
01.08.2023 |
1645 |
19 of 2022
M/s Auto Profiles Ltd. Versus Jharkhand Bijli Vitran Nigam Ltd. &Ors. |
Non-compliance of the judgement dated 19.02.2022 passed by the Consumer Grievance Redressal Forum, Chaibasa |
14.07.2023 |
1644 |
13 of 2023
Tenughat Vidyut Nigam Limited (TVNL) |
Petition purported to be filed under JSERC (Terms and Conditions for Determination of Generation Tariff) Regulations 2020 inter-alia in the clauses of Return on Equity as well as for alignment of depreciation rates as prescribed by Honble Central Electricity Regulatory Commision (CERC) |
14.07.2023 |
1643 |
12 of 2023
Tata Power Company Limited (TPCL) |
Petition purported to be filed under clause 32 & 33 of the JSERC (Terms and Conditions for Determination of Generation Tariff) Regulations 2020 read with clause 45 of the JSERC (Conduct of Business ) Regulations 2016 as well as Section 79(1) (b) of the Electricity Act 2003 seeking removal of difficulties/modification/amendment/review of provisions of JSERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2020. |
14.07.2023 |
1642 |
Case No. 03 of 2023
Inland Power Limited |
Petition for seeking amendment of the JSERC (Terms & Condition for determination of Generation Tariff) Regulation, 2020 under section 61 of the Electricity Act 2003 |
14.07.2023 |
1641 |
Case No. 17 of 2023
Adhunik Power and Natural resources Ltd. (APNRL)
Versus
Jharkhand Urja Vikas Nigam Limited & Ors. |
Petition filed under Section 91 (1) (f) of the Electricity Act 2003 and Regulation 41 of the JSERC (Conduct of Business), Regulations 2016 seeking review of the Order dated 22.05.2023 passed by JSERC in Case (T) No. 02 of 2018 in the matter of True-up for FY 2016-17 and APR for FY 2017-18 in terms of provisions of the JSERC (Terms and Conditions for Determination of Generation Tariff), Regulations 2015 for supplying the regulated contracted capacity to JUVNL/JBVNL from 540 MW Coal based power plant of APNRL at Padapur and Srirampur villages in Seraikela Kharsawan District in the State of Jharkhand. |
14.07.2023 |
1640 |
Case No. 16 of 2023
Tata Steel Limited (TSL)
|
Petition filed under section A44 of the JSERC (Conduct of Business ) Regulation 2016 for approval of Capital Expenditure for capacity augmentation of 400/132 KV Bulk Power Receiving Substation (BPRS) at Jamshedpur. |
14.07.2023 |
1639 |
Case No. 15 of 2023
The Bureau of Energy Efficiency Versus Jharkhand Bijli Vitran Nigam Limited |
Petition filed under section 27 of the Energy Conservation Act, 2001 for adjudication of the penalty under Section 26 of the Energy Conservatin Act, 2001 by the Adujdication office and for directions to Jharkhand Bijli Vitran Nigam Limited to make payment as adjuicated by the Adjudicating officer. |
14.07.2023 |
1638 |
Case No.09 of 2019
M/s Vananchal Steel Alloys (Pvt.) Ltd. Versus Damodar Valley Corporation (DVC) & Anr |
Order on Case No. 09 of 2019 |
11.07.2023 |
1637 |
Case 11 of 2023
Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to be filed under JSERC (Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering) Regulations, 2015 inter-alia for amendment of maximum peak capaciity of the grid connected rooftop solar PV system to be installed by any eligible consumer or third party owner. |
11.07.2023 |
1636 |
Case No. 10 of 2023
M/s Dilip Buildcon Limited Vrs. Jharkhand Bijli Vitran Nigam Limited |
Petition purported under clause 4.7 of the (Electricity Supply Code), Regulations, 2015 inter-alia for allowing the petitioner to take new connection from JBVNL at supply voltage of 33 KV having 1000 KVA contract demand. |
11.07.2023 |
1635 |
Case No.30 of 2020
Tata Steel Limited (TSL)
Vrs.
Damodar Valley Corporation (DVC) |
Order on Case No. 30 of 2020 |
04.07.2023 |
1634 |
Case No. 16 of 2022
M/s Rungta Mines Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition filed under section 86 of the Electricity Act 2003 read alongwith Clause 10.6, 39.1 and 41.1 of the JSERC (Terms and Conditions for Intra State Open Access), Regulations 2016 seeking necessary directioin by upon the Distribution licensee namely, JBVNL to take necessary steps to consider the case of the petitoner for grant of no objection in connection with sale of power/energy in an open market regulated by CERC and administered by NOAR |
27.06.2023 |
1633 |
Case No. 01 of 2022
SAIL Bokaro Plant Vrs. JREDA |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
27.06.2023 |
1632 |
Case No. 05 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no 01 of 2021 regarding determinatin of ARR for the MYT period from FY 2021-22 to 2025-26 and Tariff for FY 2021-22 |
27.06.2023 |
1631 |
Case No. 04 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no. 11 of 2020 regarding True-up for FY 2019-20. |
27.06.2023 |
1630 |
09 of 2023
Jharkhand Bijli Vitran Nigam Limited (JBVNL) Vrs. Solar Energy Corporation of India Limited (SECI), New Delhi |
For approval of provisional Power Purchase Agreement (PPA) between Jharkhand Bijli Vitran Nigam Limited and Solar Energy Corporation of India Limited (SECI) for purchase of 100 MW floating solar power to be installed at Getalsud Dam by Solar Energy Corporation of India Limited (SECI) |
23.06.2023 |
1629 |
08 of 2023
Damodar Valley Corporation |
Petition purported to be filed under section 62,64 & 86 of the Electricity Act, 2003 read with the applicable provisions of the DVC Act 1948, interalia for approval towards investment for creations of necessary infrastruture to provide supply of electricity to 11 KV Consumer in the state of Jharkhand by Damodar Valley Cororation in accordance with Regulation 6.12 of JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations 2020 as amended |
23.06.2023 |
1628 |
07 of 2023
M/s Sigma HTS LLP
Vrs.
Tata Steel Utilities and Infrastructure Services Ltd |
Petition purported to be filed under section 62 (5) and (6) read with section 129 of the Electricity Act, 2003 inter-alia for issuance of a direction to TSUISL to grant appropriate voltage rebate in terms of tariff order 2021-22 published on 24.11.2022 effective from 01.12.2022 |
23.06.2023 |
1627 |
Case No. 06 of 2023
Association of DVC HT Consumers of Jharkhand Vrs. Damodar Valley Corporation (DVC) |
Submission of Review petition pertaining to revision of voltage rebate and subsequent issue of corrigendum against the Tariff order for Distribution Activity of Damodar Valley Corporation (DVC) in Jharkhand State- True up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 dated 30.09.2020 issued by Hon'ble JSERC |
23.06.2023 |
1626 |
Case No. 03 of 2023
Inland Power Limited |
Petition for seeking amendment of the JSERC (Terms & Condition for determination of Generation Tariff) Regulation, 2020 under section 61 of the Electricity Act 2003 |
23.06.2023 |
1625 |
Case No. 02 of 2023
Damodar Valley Corporation
Versus
Association of DVC HT Consumers of Jharkhand |
Damodar Valley Corporation (DVC) has submitted an affidavited petition purported to be filled under section 61 and 62 of the Electricity Act, 2003 read with Regulations 22.1 of JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations 2020 for amendment of clause 10.7 of JSERC (Terms and conditions for Determination of distribution Tariff) Regulations 2020 by which celling/capping of 10% variable component has been made for the recovery of FPPPA for the part of the Damodar Valley area falling within the territory of the state of
Jharkhand. |
23.06.2023 |
1624 |
Case No. 23 of 2020
& MP No. 01 of 2022 |
Review petition on the order dated 01.10.2020 in Case (T) No. 13 of 2019 on the petition for true up for FY 2018-19, APR for FY 2019-20 and ARR Tariff for FY 2020-21 |
23.06.2023 |
1623 |
19 of 2022
M/s Auto Profiles Ltd. Versus Jharkhand Bijli Vitran Nigam Ltd. &Ors. |
Non-compliance of the judgement dated 19.02.2022 passed by the Consumer Grievance Redressal Forum, Chaibasa |
23.06.2023 |
1622 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
23.06.2023 |
1621 |
Case No.09 of 2019
M/s Vananchal Steel Alloys (Pvt.) Ltd.
Versus
Damodar Valley Corporation (DVC) & Anr |
Order on Case No. 09 of 2019 |
23.06.2023 |
1620 |
Case No. 04 of 2020
M/s Gautam Ferro Alloys Vrs. Jharkhand Bijli Vitran Nigam Ltd. & Ors. |
Order on Case No. 04 of 2020 |
23.06.2023 |
1619 |
14 of 2023
Inland Power Limited Vrs. Jharkhand Bijli Vitran Nigam Limited |
Approval of 3rd Supplementary Power Purchase Agreement (PPA) under Shakti Scheme B-II Round-V or 4300 MT of Coal to be signed between Inland Power Limited (IPL) & Jharkhand Bijli Vitrn Nigam Limited (JBVNL) |
19.06.2023 |
1618 |
14 of 2023
Inland Power Limited Vrs. Jharkhand Bijli Vitran Nigam Limited |
Approval of 3rd Supplementary Power Purchase Agreement (PPA) under Shakti Scheme B-II Round-V or 4300 MT of Coal to be signed between Inland Power Limited (IPL) & Jharkhand Bijli Vitrn Nigam Limited (JBVNL) |
12.06.2023 |
1617 |
13 of 2023
Tenughat Vidyut Nigam Limited (TVNL) |
Petition purported to be filed under JSERC (Terms and Conditions for Determination of Generation Tariff) Regulations 2020 inter-alia in the clauses of Return on Equity as well as for alignment of depreciation rates as prescribed by Honble Central Electricity Regulatory Commision (CERC) |
12.06.2023 |
1616 |
12 of 2023
Tata Power Company Limited (TPCL) |
Petition purported to be filed under clause 32 & 33 of the JSERC (Terms and Conditions for Determination of Generation Tariff) Regulations 2020 read with clause 45 of the JSERC (Conduct of Business ) Regulations 2016 as well as Section 79(1) (b) of the Electricity Act 2003 seeking removal of difficulties/modification/amendment/review of provisions of JSERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2020. |
12.06.2023 |
1615 |
11 of 2023
Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Petition purported to be filed under JSERC (Rooftop Solar PV Grid Interactive Systems and Net/Gross Metering) Regulations, 2015 inter-alia for amendment of maximum peak capaciity of the grid connected rooftop solar PV system to be installed by any eligible consumer or third party owner. |
12.06.2023 |
1614 |
Case No. 10 of 2023
M/s Dilip Buildcon Limited Vrs. Jharkhand Bijli Vitran Nigam Limited |
Petition purported under clause 4.7 of the (Electricity Supply Code), Regulations, 2015 inter-alia for allowing the petitioner to take new connection from JBVNL at supply voltage of 33 KV having 1000 KVA contract demand. |
12.06.2023 |
1613 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
12.06.2023 |
1612 |
Case No. 30 of 2020
Tata Steel Limited
Versus
Damodar Valley Corporation (DVC) |
Order on Case No. 30 of 2020 |
12.06.2023 |
1611 |
09 of 2023
Jharkhand Bijli Vitran Nigam Limited (JBVNL) Vrs. Solar Energy Corporation of India Limited (SECI), New Delhi |
For approval of provisional Power Purchase Agreement (PPA) between Jharkhand Bijli Vitran Nigam Limited and Solar Energy Corporation of India Limited (SECI) for purchase of 100 MW floating solar power to be installed at Getalsud Dam by Solar Energy Corporation of India Limited (SECI) |
16.05.2023 |
1610 |
08 of 2023
Damodar Valley Corporation |
Petition purported to be filed under section 62,64 & 86 of the Electricity Act, 2003 read with the applicable provisions of the DVC Act 1948, interalia for approval towards investment for creations of necessary infrastruture to provide supply of electricity to 11 KV Consumer in the state of Jharkhand by Damodar Valley Cororation in accordance with Regulation 6.12 of JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations 2020 as amended |
16.05.2023 |
1609 |
07 of 2023
M/s Sigma HTS LLP
Vrs.
Tata Steel Utilities and Infrastructure Services Ltd |
Petition purported to be filed under section 62 (5) and (6) read with section 129 of the Electricity Act, 2003 inter-alia for issuance of a direction to TSUISL to grant appropriate voltage rebate in terms of tariff order 2021-22 published on 24.11.2022 effective from 01.12.2022 |
16.05.2023 |
1608 |
Case No. 06 of 2023
Association of DVC HT Consumers of Jharkhand Vrs. Damodar Valley Corporation (DVC) |
Submission of Review petition pertaining to revision of voltage rebate and subsequent issue of corrigendum against the Tariff order for Distribution Activity of Damodar Valley Corporation (DVC) in Jharkhand State- True up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 dated 30.09.2020 issued by Hon'ble JSERC |
16.05.2023 |
1607 |
Case No. 30 of 2020
Tata Steel Limited
Versus
Damodar Valley Corporation (DVC) |
Order on Case No. 30 of 2020 |
16.05.2023 |
1606 |
Case No. 27 of 2020
Association of DVC HT Consumers of Jharkhand
Versus
Damodar Valley Corporation (DVC) |
Submission of Review Petition pertaining to revision of Voltage Rebate and subsequent issue of corrigendum against the Tariff Order for Distribution Activity of Damodar Valley Corporation (DVC) in Jharkhand State - True up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 dated 30.09.2020 issued by Hon'ble JSERC |
16.05.2023 |
1605 |
Case No. 02 of 2023
Damodar Valley Corporation
Versus
Association of DVC HT Consumers of Jharkhand |
Damodar Valley Corporation (DVC) has submitted an affidavited petition purported to be filled under section 61 and 62 of the Electricity Act, 2003 read with Regulations 22.1 of JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations 2020 for amendment of clause 10.7 of JSERC (Terms and conditions for Determination of distribution Tariff) Regulations 2020 by which celling/capping of 10% variable component has been made for the recovery of FPPPA for the part of the Damodar Valley area falling within the territory of the state of
Jharkhand. |
16.05.2023 |
1604 |
Case No. 23 of 2020
& MP No. 01 of 2022 |
Review petition on the order dated 01.10.2020 in Case (T) No. 13 of 2019 on the petition for true up for FY 2018-19, APR for FY 2019-20 and ARR Tariff for FY 2020-21 |
16.05.2023 |
1603 |
19 of 2022
M/s Auto Profiles Ltd. Versus Jharkhand Bijli Vitran Nigam Ltd. &Ors. |
Non-compliance of the judgement dated 19.02.2022 passed by the Consumer Grievance Redressal Forum, Chaibasa |
16.05.2023 |
1602 |
Case No.09 of 2019
M/s Vananchal Steel Alloys (Pvt.) Ltd.
Versus
Damodar Valley Corporation (DVC) & Anr |
Order on Case No. 09 of 2019 |
16.05.2023 |
1601 |
Case No. 04 of 2020
M/s Gautam Ferro Alloys Vrs. Jharkhand Bijli Vitran Nigam Ltd. & Ors. |
Order on Case No. 04 of 2020 |
16.05.2023 |
1600 |
Case No. 03 of 2023
Inland Power Limited |
Petition for seeking amendment of the JSERC (Terms & Condition for determination of Generation Tariff) Regulation, 2020 under section 61 of the Electricity Act 2003 |
16.05.2023 |
1599 |
Case No. 03 of 2023
Inland Power Limited |
Petition for seeking amendment of the JSERC (Terms & Condition for determination of Generation Tariff) Regulation, 2020 under section 61 of the Electricity Act 2003 |
12.05.2023 |
1598 |
Case No. 18 of 2022
Tata Power Company Limited (TPCL) Vrs. Tata Steel Limited (TSL) |
Review of order dated 04 November 2022 for True-up 2019-20, APR-2020-21, Business Plan & MYT for control period 2021-22 to 2025-26 |
12.05.2023 |
1597 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
12.05.2023 |
1596 |
Case No. 16 of 2022
M/s Rungta Mines Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition filed under section 86 of the Electricity Act 2003 read alongwith Clause 10.6, 39.1 and 41.1 of the JSERC (Terms and Conditions for Intra State Open Access), Regulations 2016 seeking necessary directioin by upon the Distribution licensee namely, JBVNL to take necessary steps to consider the case of the petitoner for grant of no objection in connection with sale of power/energy in an open market regulated by CERC and administered by NOAR |
12.05.2023 |
1595 |
Case No. 01 of 2022
SAIL Bokaro Plant Vrs. JREDA |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
12.05.2023 |
1594 |
Case No. 01 of 2021
Indian Railways
Vrs.
Jharkhand Urja Sancharan Nigam Ltd. |
Order on Case No. 01 of 2021 |
12.05.2023 |
1593 |
Case No. 05 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no 01 of 2021 regarding determinatin of ARR for the MYT period from FY 2021-22 to 2025-26 and Tariff for FY 2021-22 |
12.05.2023 |
1592 |
Case No. 04 of 2023
Damodar Valley Corporation (DVC) |
Review of order dated 30.01.2023 passed in Case (T) no. 11 of 2020 regarding True-up for FY 2019-20. |
12.05.2023 |
1591 |
Case No. 18 of 2022
Tata Power Company Limited (TPCL) Vrs. Tata Steel Limited (TSL) |
Review of order dated 04 November 2022 for True-up 2019-20, APR-2020-21, Business Plan & MYT for control period 2021-22 to 2025-26 |
31.03.2023 |
1590 |
Case No. 16 of 2022
M/s Rungta Mines Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition filed under section 86 of the Electricity Act 2003 read alongwith Clause 10.6, 39.1 and 41.1 of the JSERC (Terms and Conditions for Intra State Open Access), Regulations 2016 seeking necessary directioin by upon the Distribution licensee namely, JBVNL to take necessary steps to consider the case of the petitoner for grant of no objection in connection with sale of power/energy in an open market regulated by CERC and administered by NOAR |
31.03.2023 |
1589 |
Case No. 01 of 2022
SAIL Bokaro Plant Vrs. JREDA |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
31.03.2023 |
1588 |
Case No. 01 of 2021
Indian Railways
Vrs.
Jharkhand Urja Sancharan Nigam Ltd. |
Order on Case No. 01 of 2021 |
31.03.2023 |
1587 |
Case No.26 of 2020
M/s Grasim Industries Limited
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
Petition filed under clause 8.12 and 8.13 of JSERC (Utilization of surplus Capacity of CPP based on Conventional Fuel) Regulation 2010 |
31.03.2023 |
1586 |
Case No. 03 of 2023
Inland Power Limited |
Petition for seeking amendment of the JSERC (Terms & Condition for determination of Generation Tariff) Regulation, 2020 under section 61 of the Electricity Act 2003 |
31.03.2023 |
1585 |
Case No. 19 of 2022
M/s Auto Profiles Ltd.
Versus
Jharkhand Bijli Vitran Nigam Ltd. &Ors. |
Non-compliance of the judgement dated 19.02.2022 passed by the Consumer Grievance Redressal Forum, Chaibasa |
28.03.2023 |
1584 |
Case No. 30 of 2020
Tata Steel Limited
Versus
Damodar Valley Corporation (DVC) |
Order on Case No. 30 of 2020 |
28.03.2023 |
1583 |
Case No. 27 of 2020
Association of DVC HT Consumers of Jharkhand
Versus
Damodar Valley Corporation (DVC) |
Submission of Review Petition pertaining to revision of Voltage Rebate and subsequent issue of corrigendum against the Tariff Order for Distribution Activity of Damodar Valley Corporation (DVC) in Jharkhand State - True up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 dated 30.09.2020 issued by Hon'ble JSERC |
28.03.2023 |
1582 |
Case No. 23 of 2020 & MP No. 01 of 2022
Jharkhand Bijli Vitran Nigam Limited Versus
Jharkhand Small Industries Association (JSIA) |
Review petition on the order dated 01.10.2020 in Case (T) No. 13 of 2019 on the petition for true up for FY 2018-19, APR for FY 2019-20 and ARR Tariff for FY 2020-21 |
28.03.2023 |
1581 |
Case No. 04 of 2020
M/s Gautam Ferro Alloys Vrs. Jharkhand Bijli Vitran Nigam Ltd. & Ors. |
Order on Case No. 04 of 2020 |
28.03.2023 |
1580 |
Case No.09 of 2019
M/s Vananchal Steel Alloys (Pvt.) Ltd.
Versus
Damodar Valley Corporation (DVC) & Anr |
Order on Case No. 09 of 2019 |
28.03.2023 |
1579 |
Case No. 02 of 2023
Damodar Valley Corporation
Versus
Association of DVC HT Consumers of Jharkhand |
Damodar Valley Corporation (DVC) has submitted an affidavited petition purported to be filled under section 61 and 62 of the Electricity Act, 2003 read with Regulations 22.1 of JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations 2020 for amendment of clause 10.7 of JSERC (Terms and conditions for Determination of distribution Tariff) Regulations 2020 by which celling/capping of 10% variable component has been made for the recovery of FPPPA for the part of the Damodar Valley area falling within the territory of the state of Jharkhand. |
28.03.2023 |
1578 |
Case No.01 of 2023
Tata Steel Utitlites and Infrastructure Services Ltd. |
For approval of capital expenditure |
28.03.2023 |
1577 |
Case No. 10 of 2022
M/s Usha Martin Limited Vrs. JUVNL & Ors |
Order on Case No 10 of 2022 |
13.03.2023 |
1576 |
Case No. 10 of 2022
M/s Usha Martin Limited Vrs. JUVNL & Ors |
Order on Case No 10 of 2022 |
03.03.2023 |
1575 |
Case No.26 of 2020
M/s Grasim Industries Limited
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
Petition filed under clause 8.12 and 8.13 of JSERC (Utilization of surplus Capacity of CPP based on Conventional Fuel) Regulation 2010 |
03.03.2023 |
1574 |
Miscellaneous Petition No. 03 of 2022
Damodar Valley Corporation (DVC) |
Determination of single part tariff applicable for public EV Charging Stations operating in the supply area of DVC in the State of Jharkhand |
28.02.2023 |
1573 |
Case No.26 of 2020
M/s Grasim Industries Limited
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
Petition filed under clause 8.12 and 8.13 of JSERC (Utilization of surplus Capacity of CPP based on Conventional Fuel) Regulation 2010 |
28.02.2023 |
1572 |
Case No.09 of 2019
M/s Vananchal Steel Alloys (Pvt.) Ltd.
Versus
Damodar Valley Corporation (DVC) & Anr |
Order on Case No. 09 of 2019 |
28.02.2023 |
1571 |
04 of 2020
M/s Gautam Ferro Alloys
Vrs.
Jharkhand Bijli Vitran Nigam Ltd. & Others |
Order on Case No. 04 of 2020 |
28.02.2023 |
1570 |
Case No. 10 of 2022
M/s Usha Martin Limited Vrs. JUVNL & Ors |
Order on Case No 10 of 2022 |
28.02.2023 |
1569 |
Case No. 01 of 2021
Indian Railways
Vrs.
Jharkhand Urja Sancharan Nigam Ltd. |
Order on Case No. 01 of 2021 |
28.02.2023 |
1568 |
Case No. 18 of 2022
Tata Power Company Limited (TPCL) Vrs. Tata Steel Limited (TSL) |
Review of order dated 04 November 2022 for True-up 2019-20, APR-2020-21, Business Plan & MYT for control period 2021-22 to 2025-26 |
24.022023 |
1567 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
24.02.2023 |
1566 |
Miscellaneous Petition No. 03 of 2022
Damodar Valley Corporation (DVC) |
Determination of single part tariff applicable for public EV Charging Stations operating in the supply area of DVC in the State of Jharkhand |
24.02.2023 |
1565 |
Case No. 16 of 2022
M/s Rungta Mines Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition filed under section 86 of the Electricity Act 2003 read alongwith Clause 10.6, 39.1 and 41.1 of the JSERC (Terms and Conditions for Intra State Open Access), Regulations 2016 seeking necessary directioin by upon the Distribution licensee namely, JBVNL to take necessary steps to consider the case of the petitoner for grant of no objection in connection with sale of power/energy in an open market regulated by CERC and administered by NOAR |
24.02.2023 |
1564 |
Case No. 01 of 2022
SAIL Bokaro Plant Vrs. JREDA |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
24.02.2023 |
1563 |
Case No. 30 of 2020
Tata Steel Limited
Versus
Damodar Valley Corporation (DVC) |
Order on Case No. 30 of 2020 |
24.02.2023 |
1562 |
Case No. 29 of 2020
SAIL-Bokaro Steel Plant
Vrs.
Damodar Valley Corporation |
Order on Case No. 29 of 2020 |
24.02.2023 |
1561 |
Case No. 27 of 2020
Association of DVC HT Consumers of Jharkhand Versus Damodar Valley Corporation (DVC) |
Submission of Review Petition pertaining to revision of Voltage Rebate and subsequent issue of corrigendum against the Tariff Order for Distribution Activity of Damodar Valley Corporation (DVC) in Jharkhand State - True up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 dated 30.09.2020 issued by Hon'ble JSERC |
24.02.2023 |
1560 |
Case No.22 of 2020
Association of DVC HT Consumers of Jharkhand
Vrs.
Damodar Valley Corporation (DVC) |
Determination of Retail Tariff and implementaion of refund to the consumers of DVC in the area of Jharkhand for the period from 01.4.2006 to 31.10.2012 |
24.02.2023 |
1579 |
08 of 2022
M/s Vijayshree Autocom Ltd. Vrs. Jharkhand Bili Vitran Nigam Ltd. |
Petition filed under Regulation 26 of the JSERC (Guidelines for Establishment of Forum for Redressal of Grievance of the Consumers and Electricity Ombudsman) Regulations, 2021 read with Section 142,146,149 of the Electricity Act 2003, against the Licensee JBVNL for non-compliance of the order passed by Ld.VUSNF at Karandih, Jamshedpur. |
21.02.2023 |
1578 |
Case No.26 of 2020
M/s Grasim Industries Limited
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
Petition filed under clause 8.12 and 8.13 of JSERC (Utilization of surplus Capacity of CPP based on Conventional Fuel) Regulation 2010 |
21.02.2023 |
1577 |
Case No.09 of 2019
M/s Vananchal Steel Alloys (Pvt.) Ltd.
Versus
Damodar Valley Corporation (DVC) & Anr |
Order on Case No. 09 of 2019 |
21.02.2023 |
1576 |
Case No.23 of 2020
Jharkhand Bijli Vitran Nigam Limited |
Review petition on the order dated 01.10.2020 in Case (T) No. 13 of 2019 on the petition for true up for FY 2018-19, APR for FY 2019-20 and ARR Tariff for FY 2020-21 |
21.02.2023 |
1575 |
04 of 2020
M/s Gautam Ferro Alloys
Vrs.
Jharkhand Bijli Vitran Nigam Ltd. & Others |
Order on Case No. 04 of 2020 |
21.02.2023 |
1574 |
19 of 2022
M/s Auto Profiles Ltd. Versus Jharkhand Bijli Vitran Nigam Ltd. &Ors. |
Non-compliance of the judgement dated 19.02.2022 passed by the Consumer Grievance Redressal Forum, Chaibasa |
21.02.2023 |
1573 |
Case No. 10 of 2022
M/s Usha Martin Limited Vrs. JUVNL & Ors |
Order on Case No 10 of 2022 |
20.02.2023 |
1572 |
Case No. 10 of 2022
M/s Usha Martin Limited Vrs. JUVNL & Ors |
Order on Case No 10 of 2022 |
14.02.2023 |
1571 |
Case No. 01 of 2021
Indian Railways
Vrs.
Jharkhand Urja Sancharan Nigam Ltd. |
Order on Case No. 01 of 2021 |
14.02.2023 |
1570 |
Case No.26 of 2020
M/s Grasim Industries Limited
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
Petition filed under clause 8.12 and 8.13 of JSERC (Utilization of surplus Capacity of CPP based on Conventional Fuel) Regulation 2010 |
14.02.2023 |
1569 |
Case No.09 of 2019
M/s Vananchal Steel Alloys (Pvt.) Ltd.
Versus
Damodar Valley Corporation (DVC) & Anr |
Order on Case No. 09 of 2019 |
14.02.2023 |
1568 |
Case No. 04 of 2020
M/s Gautam Ferro Alloys Vrs. Jharkhand Bijli Vitran Nigam Ltd. & Ors. |
Order on Case No. 04 of 2020 |
24.01.2023 |
1567 |
Case No.26 of 2020
M/s Grasim Industries Limited
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
Petition filed under clause 8.12 and 8.13 of JSERC (Utilization of surplus Capacity of CPP based on Conventional Fuel) Regulation 2010 |
24.01.2023 |
1566 |
Case No. 23 of 2020
& MP No. 01 of 2022
|
Review petition on the order dated 01.10.2020 in Case (T) No. 13 of 2019 on the petition for true up for FY 2018-19, APR for FY 2019-20 and ARR Tariff for FY 2020-21 |
24.01.2023 |
1565 |
Case No.09 of 2019
M/s Vananchal Steel Alloys (Pvt.) Ltd.
Versus
Damodar Valley Corporation (DVC) & Anr |
Order on Case No. 09 of 2019 |
24.01.2023 |
1564 |
Case No. 18 of 2022
Tata Power Company Limited (TPCL) Vrs. Tata Steel Limited (TSL) |
Review of order dated 04 November 2022 for True-up 2019-20, APR-2020-21, Business Plan & MYT for control period 2021-22 to 2025-26 |
20.01.2023 |
1563 |
Case No. 17 of 2022
Inland Power Limited (IPL) Vrs. Jharkhand Urja Vikas Nigam Limited & Ors. |
Review of order dated 04th November 2022 for True up for FY 2019-20 |
20.01.2023 |
1562 |
Miscellaneous Petition No. 03 of 2022
Damodar Valley Corporation (DVC) |
Determination of single part tariff applicable for public EV Charging Stations operating in the supply area of DVC in the State of Jharkhand |
20.01.2023 |
1561 |
Miscellaneous Petition No. 02 of 2022
Inland Power Limited (IPL)
Versus
1. Jharkhand Urja Vikas Nigam Limited 2. Jharhand Bijli Vitran Nigam Limited. |
Pursuance of order dated 16.09.2022 passed by Hon'ble APTEL in Appeal No.411 of 2019 for revised determination of fixed charges for FY 2014-15. |
20.01.2023 |
1560 |
Case No. 16 of 2022
M/s Rungta Mines Ltd. Vrs. Jharkhand Urja Vikas Nigam Limited (JUVNL) |
Petition filed under section 86 of the Electricity Act 2003 read alongwith Clause 10.6, 39.1 and 41.1 of the JSERC (Terms and Conditions for Intra State Open Access), Regulations 2016 seeking necessary directioin by upon the Distribution licensee namely, JBVNL to take necessary steps to consider the case of the petitoner for grant of no objection in connection with sale of power/energy in an open market regulated by CERC and administered by NOAR |
20.01.2023 |
1559 |
Case No. 06 of 2022
Damodar Valley Corporation (DVC) |
Affidavated petition purported to be filed under Regulations 6.29 of the JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 and its amendments thereof for approval of Power Usage Agreement (PUA) between Damodar Valley Corporation (DVC) and NTPC Renewable Energy Ltd (NTPC REL) for purchase of 100 MW Solar Power by DVC under CPSU Scheme. |
20.01.2023 |
1558 |
Case No. 05 of 2022
Damodar Valley Corporation (DVC) |
Affidavated petition purported to be filed under Regulations 6.29 of the JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 and its amendments thereof for approval of Power Sale Agreement (PSA) between Damodar Valley Corporation (DVC) and Solar Energy Corporation India Limited (SECI) for purchase of 200 MW Assured Peak Power by DVC, which in turn to be procured by SECI from ISTS-Connected RE Projects with storage to be Developed by Renewable Power Developers (RPD). |
20.01.2023 |
1557 |
Case No. 03 of 2022
Damodar Valley Corporation (DVC) |
Petition purported to be filed under Regulations 6.29 of the JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 and its amendments thereof for approval of Power Purchase Agreement (PPA) between Damodar Valley Corporation (DVC) and Jyotikiran Energy Mumbai Pvt. Ltd. (JEM) for purchase of power by DVC from the solar photovoltaic power plant of 1137 kWp (Project 1 : 493.12kWp, Project 2: 446.9 kWp and Project 3: 196.98 kWp) to be commissioned at Koderma Thermal Power Station (KTPS) of DVC at Koderma district in the State of
Jharkhand. |
20.01.2023 |
1556 |
Case No.02 of 2022
Damodar Valley Corporation (DVC) |
Petition purported to be filed under Regulations 6.29 of the JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 and its amendments thereof for approval of Power Purchase Agreement (PPA) between Damodar Valley Corporation (DVC) and Jyotikiran Energy Mumbai Pvt. Ltd. (JEM) for purchase of power by DVC from the solar photovoltaic power plant of 278.72 kWp to be commissioned at Maithon of DVC Maithon, P.O. – Maithon Dam at Dhanbad District in the State of Jharkhand. |
20.01.2023 |
1555 |
Case No. 01 of 2022
SAIL Bokaro Plant Vrs. JREDA |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
20.01.2023 |
1554 |
Case No. 30 of 2020
Tata Steel Limited
Versus
Damodar Valley Corporation (DVC) |
Order on Case No. 30 of 2020 |
20.01.2023 |
1553 |
Case No. 29 of 2020
SAIL-Bokaro Steel Plant
Vrs.
Damodar Valley Corporation |
Order on Case No. 29 of 2020 |
20.01.2023 |
1552 |
Case No. 27 of 2020
Association of DVC HT Consumers of Jharkhand Versus Damodar Valley Corporation (DVC) |
Submission of Review Petition pertaining to revision of Voltage Rebate and subsequent issue of corrigendum against the Tariff Order for Distribution Activity of Damodar Valley Corporation (DVC) in Jharkhand State - True up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 dated 30.09.2020 issued by Hon'ble JSERC |
20.01.2023 |
1551 |
Case No.22 of 2020
Association of DVC HT Consumers of Jharkhand
Vrs.
Damodar Valley Corporation (DVC) |
Determination of Retail Tariff and implementaion of refund to the consumers of DVC in the area of Jharkhand for the period from 01.4.2006 to 31.10.2012 |
20.01.2023 |
1550 |
04 of 2020
M/s Gautam Ferro Alloys
Vrs.
Jharkhand Bijli Vitran Nigam Ltd. & Others |
Order on Case No. 04 of 2020 |
20.01.2023 |
1549 |
19 of 2022
M/s Auto Profiles Ltd. Versus Jharkhand Bijli Vitran Nigam Ltd. &Ors. |
Non-compliance of the judgement dated 19.02.2022 passed by the Consumer Grievance Redressal Forum, Chaibasa |
17.01.2023 |
1548 |
04 of 2020
M/s Gautam Ferro Alloys
Vrs.
Jharkhand Bijli Vitran Nigam Ltd. & Others |
Order on Case No. 04 of 2020 |
17.01.2023 |
1547 |
08 of 2022
M/s Vijayshree Autocom Ltd. Vrs. Jharkhand Bili Vitran Nigam Ltd. |
Petition filed under Regulation 26 of the JSERC (Guidelines for Establishment of Forum for Redressal of Grievance of the Consumers and Electricity Ombudsman) Regulations, 2021 read with Section 142,146,149 of the Electricity Act 2003, against the Licensee JBVNL for non-compliance of the order passed by Ld.VUSNF at Karandih, Jamshedpur. |
16.01.2023 |
1546 |
Case No. 10 of 2022
M/s Usha Martin Limited Vrs. JUVNL & Ors |
Order on Case No 10 of 2022 |
16.01.2023 |
1545 |
Case No. 29 of 2020
SAIL-Bokaro Steel Plant
Vrs.
Damodar Valley Corporation |
Order on Case No. 29 of 2020 |
16.01.2023 |
1544 |
Case No. 27 of 2020
Association of DVC HT Consumers of Jharkhand Versus Damodar Valley Corporation (DVC) |
Submission of Review Petition pertaining to revision of Voltage Rebate and subsequent issue of corrigendum against the Tariff Order for Distribution Activity of Damodar Valley Corporation (DVC) in Jharkhand State - True up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 dated 30.09.2020 issued by Hon'ble JSERC |
16.01.2023 |
1543 |
Case No.26 of 2020
M/s Grasim Industries Limited
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
Petition filed under clause 8.12 and 8.13 of JSERC (Utilization of surplus Capacity of CPP based on Conventional Fuel) Regulation 2010 |
10.01.2023 |
1542 |
Case No.23 of 2020
Jharkhand Bijli Vitran Nigam Limited |
Review petition on the order dated 01.10.2020 in Case (T) No. 13 of 2019 on the petition for true up for FY 2018-19, APR for FY 2019-20 and ARR Tariff for FY 2020-21 |
10.01.2023 |
1541 |
Case No. 09 of 2019
M/s Vananchal Steel Alloys Private Limited Versus Damodar Valley Corporation & another |
Order on Case No. 09 of 2019 |
10.01.2023 |
1540 |
Case No. 01 of 2021
Indian Railways
Vrs.
Jharkhand Urja Sancharan Nigam Ltd. |
Order on Case No. 01 of 2021 |
10.01.2023 |
1539 |
08 of 2022
M/s Vijayshree Autocom Ltd. Vrs. Jharkhand Bili Vitran Nigam Ltd. |
Petition filed under Regulation 26 of the JSERC (Guidelines for Establishment of Forum for Redressal of Grievance of the Consumers and Electricity Ombudsman) Regulations, 2021 read with Section 142,146,149 of the Electricity Act 2003, against the Licensee JBVNL for non-compliance of the order passed by Ld.VUSNF at Karandih, Jamshedpur. |
20.12.2022 |
1538 |
Case No. 04 of 2020
M/s Gautam Ferro Alloys Vrs. Jharkhand Bijli Vitran Nigam Ltd. & Ors. |
Order on Case No. 04 of 2020 |
20.12.2022 |
1537 |
Miscellaneous Petition No. 02 of 2020
Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Seeking extension of the timeline provided in Tariff order dated 01st October 2020 of JBVNL for metering of unmtered consumers |
20.12.2022 |
1536 |
08 of 2022
M/s Vijayshree Autocom Ltd. Vrs. Jharkhand Bili Vitran Nigam Ltd. |
Petition filed under Regulation 26 of the JSERC (Guidelines for Establishment of Forum for Redressal of Grievance of the Consumers and Electricity Ombudsman) Regulations, 2021 read with Section 142,146,149 of the Electricity Act 2003, against the Licensee JBVNL for non-compliance of the order passed by Ld.VUSNF at Karandih, Jamshedpur. |
13.12.2022 |
1535 |
Case No. 29 of 2020
SAIL-Bokaro Steel Plant
Vrs.
Damodar Valley Corporation |
Order on Case No. 29 of 2020 |
13.12.2022 |
1534 |
Case No. 27 of 2020
Association of DVC HT Consumers of Jharkhand Versus Damodar Valley Corporation (DVC) |
Submission of Review Petition pertaining to revision of Voltage Rebate and subsequent issue of corrigendum against the Tariff Order for Distribution Activity of Damodar Valley Corporation (DVC) in Jharkhand State - True up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 dated 30.09.2020 issued by Hon'ble JSERC |
13.12.2022 |
1533 |
Case No.22 of 2020
Association of DVC HT Consumers of Jharkhand
Vrs.
Damodar Valley Corporation (DVC) |
Determination of Retail Tariff and implementaion of refund to the consumers of DVC in the area of Jharkhand for the period from 01.4.2006 to 31.10.2012 |
13.12.2022 |
1532 |
Case No.26 of 2020
M/s Grasim Industries Limited
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
Petition filed under clause 8.12 and 8.13 of JSERC (Utilization of surplus Capacity of CPP based on Conventional Fuel) Regulation 2010 |
09.12.2022 |
1531 |
Case No.23 of 2020
Jharkhand Bijli Vitran Nigam Limited |
Review petition on the order dated 01.10.2020 in Case (T) No. 13 of 2019 on the petition for true up for FY 2018-19, APR for FY 2019-20 and ARR Tariff for FY 2020-21 |
09.12.2022 |
1530 |
Case No. 04 of 2020
M/s Gautam Ferro Alloys Vrs. Jharkhand Bijli Vitran Nigam Ltd. & Ors. |
Order on Case No. 04 of 2020 |
09.12.2022 |
1529 |
Case No. 09 of 2019
M/s Vananchal Steel Alloys Private Limited Versus Damodar Valley Corporation & another |
Order on Case No. 09 of 2019 |
09.12.2022 |
1528 |
Case No. 12 of 2022 |
Order on Case No 12 of 2022 |
02.12.2022 |
1527 |
Case No. 10 of 2022
M/s Usha Martin Limited Vrs. JUVNL & Ors |
Order on Case No 10 of 2022 |
02.12.2022 |
1526 |
07 of 2022
Jharkhand Urja Sancharan Nigam Limited (JUSNL) |
Jharkhand Urja Sancharan Nigam Ltd. (JUSNL) Review of order dated 30.12.2020 on true-up 2015-16 & 2016-17 |
02.12.2022 |
1525 |
Case No. 01 of 2021
Indian Railways
Vrs.
Jharkhand Urja Sancharan Nigam Ltd. |
Order on Case No. 01 of 2021 |
02.12.2022 |
1524 |
06 of 2022
Damodar Valley Corporation (DVC) |
Affidavated petition purported to be filed under Regulations 6.29 of the JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 and its amendments thereof for approval of Power Usage Agreement (PUA) between Damodar Valley Corporation (DVC) and NTPC Renewable Energy Ltd (NTPC REL) for purchase of 100 MW Solar Power by DVC under CPSU Scheme. |
22.11.2022 |
1523 |
Case No. 05 of 2022
Damodar Valley Corporation (DVC) |
Affidavated petition purported to be filed under Regulations 6.29 of the JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 and its amendments thereof for approval of Power Sale Agreement (PSA) between Damodar Valley Corporation (DVC) and Solar Energy Corporation India Limited (SECI) for purchase of 200 MW Assured Peak Power by DVC, which in turn to be procured by SECI from ISTS-Connected RE Projects with storage to be Developed by Renewable Power Developers (RPD). |
22.11.2022 |
1522 |
Case No. 03 of 2022
Damodar Valley Corporation (DVC) |
Petition purported to be filed under Regulations 6.29 of the JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 and its amendments thereof for approval of Power Purchase Agreement (PPA) between Damodar Valley Corporation (DVC) and Jyotikiran Energy Mumbai Pvt. Ltd. (JEM) for purchase of power by DVC from the solar photovoltaic power plant of 1137 kWp (Project 1 : 493.12kWp, Project 2: 446.9 kWp and Project 3: 196.98 kWp) to be commissioned at Koderma Thermal Power Station (KTPS) of DVC at Koderma district in the State of
Jharkhand. |
22.11.2022 |
1521 |
Case No.02 of 2022
Damodar Valley Corporation (DVC) |
Petition purported to be filed under Regulations 6.29 of the JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 and its amendments thereof for approval of Power Purchase Agreement (PPA) between Damodar Valley Corporation (DVC) and Jyotikiran Energy Mumbai Pvt. Ltd. (JEM) for purchase of power by DVC from the solar photovoltaic power plant of 278.72 kWp to be commissioned at Maithon of DVC Maithon, P.O. – Maithon Dam at Dhanbad District in the State of Jharkhand. |
22.11.2022 |
1520 |
Case No. 01 of 2022
SAIL Bokaro Plant Vrs. JREDA |
Petition purported to be filed under Regulations 13 read with 15.2 of the JSERC (Renewable Purchase Obligation and its compliance) Regulations, 2016 for exemption from RPO compliance for the period 2016-17, 2017-18, 2018-19, 2019-20, 2020-21 and further periods in terms of 2016 and 2021 (First amendment) Regulations. |
22.11.2022 |
1519 |
Case No. 01 of 2021
Indian Railways
Vrs.
Jharkhand Urja Sancharan Nigam Ltd. |
Order on Case No. 01 of 2021 |
22.11.2022 |
1518 |
Case No. 30 of 2020
Tata Steel Limited
Versus
Damodar Valley Corporation (DVC) |
Order on Case No. 30 of 2020 |
22.11.2022 |
1517 |
Case No. 04 of 2020
M/s Gautam Ferro Alloys Vrs. Jharkhand Bijli Vitran Nigam Ltd. & Ors. |
Order on Case No. 04 of 2020 |
22.11.2022 |
1516 |
Miscellaneous Petition No. 02 of 2020
Jharkhand Bijli Vitran Nigam Limted |
Order on MP No. 02 of 2020 |
22.11.2022 |
1515 |
Case No. 04 of 2022
M/s Adani Power(Jharkhand) Ltd. (APJL) Vrs. Jharkhand Bijli Vitran Nigam Ltd. (JBVNL)
|
Affidavited petition purported to be filed under clause 4.7 of JSERC (Electricity Supply Code) Regulations, 2015 interalia for allowing the petitioner to avail power supply at 132 KV for load of 2 MVA going up to 40 MW (peak load) and for approval of revised load schedule with fixed time period. |
01.11.2022 |
1514 |
Case No. 15 of 2022
Tata Steel Utilities and Infrastructure Limited (JSUISL)
Versus
Damodar Valley Corporation (DVC) |
Approval of Power Purchase Agreement between Damodar Valley Corporation (DVC) and Tata Steel Utitlites and Infrastructure Services Limited (TSUISL) |
01.11.2022 |
1513 |
Case No. 12 of 2022
M/s Satyug Foods Pvt. Ltd. Versus Jharkhand Urja Vikas Nigam Limited & Ors |
Order on Case No 12 of 2022 |
01.11.2022 |
1512 |
Case No. 10 of 2022
M/s Usha Martin Limited Vrs. JUVNL & Ors |
Order on Case No 10 of 2022 |
01.11.2022 |
1511 |
08 of 2022
M/s Vijayshree Autocom Ltd. Vrs. Jharkhand Bili Vitran Nigam Ltd. |
Petition filed under Regulation 26 of the JSERC (Guidelines for Establishment of Forum for Redressal of Grievance of the Consumers and Electricity Ombudsman) Regulations, 2021 read with Section 142,146,149 of the Electricity Act 2003, against the Licensee JBVNL for non-compliance of the order passed by Ld.VUSNF at Karandih, Jamshedpur. |
01.11.2022 |
1510 |
07 of 2022
Jharkhand Urja Sancharan Nigam Limited (JUSNL) |
Jharkhand Urja Sancharan Nigam Ltd. (JUSNL) Review of order dated 30.12.2020 on true-up 2015-16 & 2016-17 |
01.11.2022 |
1509 |
Case No.26 of 2020
M/s Grasim Industries Limited
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
Petition filed under clause 8.12 and 8.13 of JSERC (Utilization of surplus Capacity of CPP based on Conventional Fuel) Regulation 2010 |
01.11.2022 |
1508 |
Case No. 25 of 2020
Tata Steel Utilities and Infrastructure Services Limited (TSUISL) |
For review of tariff order dated 29.09.2020 |
01.11.2022 |
1507 |
Case No.23 of 2020
Jharkhand Bijli Vitran Nigam Limited |
Review petition on the order dated 01.10.2020 in Case (T) No. 13 of 2019 on the petition for true up for FY 2018-19, APR for FY 2019-20 and ARR Tariff for FY 2020-21 |
01.11.2022 |
1506 |
Case No. 09 of 2019
M/s Vananchal Steel Alloys Private Limited Versus Damodar Valley Corporation & another |
Order on Case No. 09 of 2019 |
01.11.2022 |
1505 |
Case No. 04 of 2022
M/s Adani Power(Jharkhand) Ltd. (APJL) Vrs. Jharkhand Bijli Vitran Nigam Ltd. (JBVNL) |
Affidavited petition purported to be filed under clause 4.7 of JSERC (Electricity Supply Code) Regulations, 2015 interalia for allowing the petitioner to avail power supply at 132 KV for load of 2 MVA going up to 40 MW (peak load) and for approval of revised load schedule with fixed time period. |
28.10.2022 |
1504 |
Case No. 30 of 2020
Tata Steel Limited
Versus
Damodar Valley Corporation (DVC) |
Order on Case No. 30 of 2020 |
28.10.2022 |
1503 |
Case No. 29 of 2020
SAIL-Bokaro Steel Plant
Vrs.
Damodar Valley Corporation |
Order on Case No. 29 of 2020 |
28.10.2022 |
1502 |
Case No. 27 of 2020
Association of DVC HT Consumers of Jharkhand Versus Damodar Valley Corporation (DVC) |
Submission of Review Petition pertaining to revision of Voltage Rebate and subsequent issue of corrigendum against the Tariff Order for Distribution Activity of Damodar Valley Corporation (DVC) in Jharkhand State - True up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 dated 30.09.2020 issued by Hon'ble JSERC |
28.10.2022 |
1501 |
Case No.22 of 2020
Association of DVC HT Consumers of Jharkhand
Vrs.
Damodar Valley Corporation (DVC) |
Determination of Retail Tariff and implementaion of refund to the consumers of DVC in the area of Jharkhand for the period from 01.4.2006 to 31.10.2012 |
28.10.2022 |
1500 |
08 of 2022
M/s Vijayshree Autocom Ltd. Vrs. Jharkhand Bili Vitran Nigam Ltd. |
Petition filed under Regulation 26 of the JSERC (Guidelines for Establishment of Forum for Redressal of Grievance of the Consumers and Electricity Ombudsman) Regulations, 2021 read with Section 142,146,149 of the Electricity Act 2003, against the Licensee JBVNL for non-compliance of the order passed by Ld.VUSNF at Karandih, Jamshedpur. |
18.10.2022 |
1499 |
06 of 2022
Damodar Valley Corporation (DVC) |
Affidavated petition purported to be filed under Regulations 6.29 of the JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 and its amendments thereof for approval of Power Usage Agreement (PUA) between Damodar Valley Corporation (DVC) and NTPC Renewable Energy Ltd (NTPC REL) for purchase of 100 MW Solar Power by DVC under CPSU Scheme. |
18.10.2022 |
1498 |
Case No. 05 of 2022
Damodar Valley Corporation (DVC) |
Affidavated petition purported to be filed under Regulations 6.29 of the JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 and its amendments thereof for approval of Power Sale Agreement (PSA) between Damodar Valley Corporation (DVC) and Solar Energy Corporation India Limited (SECI) for purchase of 200 MW Assured Peak Power by DVC, which in turn to be procured by SECI from ISTS-Connected RE Projects with storage to be Developed by Renewable Power Developers (RPD). |
18.10.2022 |
1497 |
Case No. 03 of 2022
Damodar Valley Corporation (DVC) |
Petition purported to be filed under Regulations 6.29 of the JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 and its amendments thereof for approval of Power Purchase Agreement (PPA) between Damodar Valley Corporation (DVC) and Jyotikiran Energy Mumbai Pvt. Ltd. (JEM) for purchase of power by DVC from the solar photovoltaic power plant of 1137 kWp (Project 1 : 493.12kWp, Project 2: 446.9 kWp and Project 3: 196.98 kWp) to be commissioned at Koderma Thermal Power Station (KTPS) of DVC at Koderma district in the State of
Jharkhand. |
18.10.2022 |
1496 |
Case No.02 of 2022
Damodar Valley Corporation (DVC) |
Petition purported to be filed under Regulations 6.29 of the JSERC (Terms and Conditions for Determination of Distribution Tariff) Regulations, 2020 and its amendments thereof for approval of Power Purchase Agreement (PPA) between Damodar Valley Corporation (DVC) and Jyotikiran Energy Mumbai Pvt. Ltd. (JEM) for purchase of power by DVC from the solar photovoltaic power plant of 278.72 kWp to be commissioned at Maithon of DVC Maithon, P.O. – Maithon Dam at Dhanbad District in the State of Jharkhand. |
18.10.2022 |
1495 |
Miscellaneous Petition No. 02 of 2020
Jharkhand Bijli Vitran Nigam Limted |
Order on MP No. 02 of 2020 |
18.10.2022 |
1494 |
Case No. 25 of 2020
|