Case No. |
Subject/Name of Parties |
Date of Hearing/Orders |
Status |
|
01 |
Case No. 29 of 2024
M/s Eastern Coalfields Limited
Vrs.
Jharkhand Urja Sancharan Nigam Limited & Ors |
For direction upon the Respondent JUSNL to release the claim amount of Rs.32.97 Cr. which is the 80% of the operations & Maintenance (O&M) cost borned by the petitioner upto April 2015 |
04.12.2026
at 02.00 P.M |
|
|
02 |
Case No.20 of 2025
Jharkhand Renewable Energy Development Agency (JREDA)
Vrs.
Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Approval of Feed -in Tariff for Ground Mounted, Canal-top and Floating solar projects having capacity less than 10 MW |
04.12.2026
at 02.00 P.M |
|
|
03 |
Case No. 21 of 2025
Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
Review of order dated 30.04.2025 regarding True-up for FY 2023-24, Annual Performance Review for FY 2024-25, Aggregate Revenue Requirement & Tariff for FY 2025-26 |
04.12.2026
at 02.00 P.M |
|
|
04 |
Case No. 22 of 2025
State Load Despatch Center (SLDC) |
Review of order dated 30.04.2025 reg - Provisional of True-up 23-24, Annual Performance Review 2024-25and ARR and SLDC charges for FY 2025-26 |
04.12.2026
at 02.00 P.M |
|
|
05 |
Misscellaneus Petition No. 01 of 2026
|
For approval of trading of surplus green power by Damodar Valley Corporation |
04.12.2026
at 02.00 P.M |
|
|
06 |
Case No. 11 of 2026
M/s Priya Stone Mines
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
Seeking necessary approval to get fresh electrical connection from Jharkhand Bijli Vitran Nigam Limited on total contract demand 700 KVA applied under H.T.S category at supply voltage of 33 KV |
04.12.2026
at 02.00 P.M |
|
|
07 |
Case No.32 of 2025
Adhunik Power & Natural Resources Limited |
Petition filed by APNRL Under Section 86(1) (f) of the Electricity Act, 2003 Regarding Dispute on Non-payment of Fixed Chares under PPA |
04.12.2026
at 02.00 P.M |
|
|
08 |
Case No. 43 of 2025
Hindalco Industries Limited
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
For grant of new Electricity Connection for a contracted load of 7500 KVA at supply voltage 132 KVA |
04.12.2026
at 02.00 P.M |
|
|
09 |
Case No. 01 of 2026
M/s Rungta Mines Limited
Vrs.
Jharkhand Renewable Energy Development Authority (JREDA) |
For extemption/relaxation on compliance of Renewable Purchase Obligation considerging the fulfillment of RPO compliance are fully met with electricity produced from Captive Co-generation unit of the petitoner is for in excess of its RPO requirements for FY 2020-21. |
04.12.2026
at 02.00 P.M |
|
|
10 |
Case No. 02 of 2026
M/s Rungta Mines Limited
Vrs.
Jharkhand Renewable Energy Development Authority (JREDA) |
For grant of exemption/relaxation on compliance of Renewable Purchase Obligation considering the fulfillment of RPO compliances are fully met with the electricity produced from Captive Co-generation unit of the petitoiner is for in excess of its RPO requirments for the period of 2024-25 |
04.12.2026
at 02.00 P.M |
|
11 |
Case No. 03 of 2026
M/s Rungta Mines Limited
Vrs.
Jharkhand Renewable Energy Development Authority (JREDA) |
For grant of exemption/relaxation on compliance of Renewable Purchase Obligation considerging the fulfillment of RPO compliance are fully met with the electricity produced from Captive Co-generation unit of the petitoner is for in excess of its RPO requirements for the period of 2025-26. |
04.12.2026
at 02.00 P.M |
|
12 |
Case No. 04 of 2026
M/s Rungta Mines Limited
Vrs.
Jharkhand Renewable Energy Development Authority (JREDA) |
For grant of exemption/relaxation on compliance of Renewable Purchase Obligation considerging the fulfillment of RPO compliance are fully met with the electricity produced from Captive Co-generation unit of the petitoner is for in excess of its RPO requirements for the period of 2021-22 |
04.12.2026
at 02.00 P.M |
|
13 |
Case No. 05 of 2026
M/s Rungta Mines Limited
Vrs.
Jharkhand Renewable Energy Development Authority (JREDA) |
For grant of exemption/relaxation on compliance of Renewable Purchase Obligation considerging the fulfillment of RPO compliance are fully met with the electricity produced from Captive Co-generation unit of the petitoner is for in excess of its RPO requirements for the period of 2022-23 |
04.12.2026
at 02.00 P.M |
|
14 |
Case No. 06 of 2026
M/s Rungta Mines Limited
Vrs.
Jharkhand Renewable Energy Development Authority |
For grant of exemption/relaxation on compliance of Renewable Purchase Obligation considerging the fulfillment of RPO compliance are fully met with the electricity produced from Captive Co-generation unit of the petitoner is for in excess of its RPO requirements for the period of 2023-24. |
04.12.2026
at 02.00 P.M |
|
15 |
30 of 2026
Damodar Valley Corporation
Vrs.
Jharkhand Bijli Vitran Nigam Limited
|
Approval for participation of DVC, in its Capacity as Distribution Licensee in the State of Jharkhand in Electricity Futures Trading on recognized Commodity Exchange (NSE/MCX) through SEBI- registered broker(s), Strictly for hedging purposes and limited to its exposure in the state of jharkhand |
04.12.2026
at 02.00 P.M |
|
|
17 |
Suo-Moto Case No.22 of 2026
The Commission on its own motion
Vrs.
Damador Valley Corporation (DVC) & Ors |
Direction given by the Hon'ble APTEL in order dated 24.04.2026 passed in Appeal No. 227 of 2025 & IA No. 1092 of 2025 for identifying DVC's assets forming distribution system within the state of Jharkhand and determine of is tariff with effect from 01.04.2027 |
11.12.2026
at 02.00 P.M |
|
|
18 |
Execution Case No 01 of 2026 arising out of Suo-moto Case No. 23 of 2025
The Commission on its motion
Vrs.
Jharkhand Bijli Vitran Nigam Limited through its Executive Director (C&R), JBVNL |
Hearing on Execution Case No. 01 of 2026 arising out of Suo-motu Case No.23 of 2025 |
11.12.2026
at 02.00 P.M |
|
|
19 |
I.A No. 04 of 2026 in Review Case No. 24 of 2026
Inland Power Limited |
Review of order dated 30.03.2026 passed by this Hon'ble Commission in Case (T) No. 15 of 2025 for Business Plan and Multi Year Tariff for Control Period FY 2026-27 to FY 2030-31 for 1x63 MW Coal Fired CFBC Thermal Power Project of Inland Power Limited under Section 61 & 62 of the Electricity Act 2003 |
11.12.2026
at 02.00 P.M |
|
|
20 |
Suo-Motu Case No. 35of 2026
The Commission on its motion
Vrs.
Jharkhand Bijli Vitran Nigam Limited (JBVNL) throught its Executive Director (Commercial), JBVNL |
Suo-MotuProceedings against Jharkhand Bijli Vitran Nigam Limited (JBVNL) for Non-Compliance with the Provisions of the JSERC (Distribution Licensees' Standard of Performace) Regulations, 2015, regarding Non-submission of Quarterly SAIFI and SAIDI Reliability Indices. |
11.12.2026
at 02.00 P.M |
|
|
21 |
Suo-Motu Case No. 36 of 2026
The Commission on its motion
Vrs.
Damodar Valley Corporation (DVC) throught its Executive Director (Commercial), DVC |
Suo-MotuProceedings against Damodar Valley Corporation (DVC) for Non-Compliance with the Provisions of the JSERC (Distribution Licensees' Standard of Performace) Regulations, 2015, regarding Non-submission of Quarterly SAIFI and SAIDI Reliability Indices. |
11.12.2026
at 02.00 P.M |
|
|
22 |
Suo-Motu Case No. 37 of 2026
The Commission on its motion
Vrs.
Steel Authority of India Limited (SAIL) throught its General Manager (TA-Electrical) SAIL |
Suo-MotuProceedings against Steel Authority of India Limited (SAIL) for Non-Compliance with the Provisions of the JSERC (Distribution Licensees' Standard of Performace) Regulations, 2015, regarding Non-submission of Quarterly SAIFI and SAIDI Reliability Indices. |
11.12.2026
at 02.00 P.M |
|
|
23 |
Case No. 38 of 2026
Jharkhand Urja Utpadan Nigam Limited (JUUNL) |
Review of order dated 18.09.2026 passed in Case (T) No 06 of 2026 for True-up for FY 2023-24 |
11.12.2026
at 02.00 P.M |
|
|
24 |
Case No. 39 of 2026
M/s Shah Sponge & Power Limited
Vrs.
Jharkhand Bijli Vitran Nigam Limited
(JBVNL) |
Implementation of order dated 02.04.2026 passed by Learned Electricity Ombudsman Case No. EOJ/11 of 2024 |
11.12.2026
at 02.00 P.M |
|
|
25 |
26 of 2026
M/s Jain Mangla Iron & Steel Pvt. Ltd. Vrs.
JUVNL & Ors. |
Approval for shifting its voltage supply from 11 KV to 33 KV line under HTS Tariff with an existing contract demand of 650 KVA |
08.01.2027
at 02.00 P.M |
|
|
26 |
31 of 2026
M/s Inland Power Limited Vs.
Jharkhand Bijli Vitran Nigam Limited
|
For fuel and power purchase cost Adjustment framework and the Ministry of Power's Comprehensive Policy for Co-firing of Biomass Pellets in Coal based Thermal Power Plants |
08.01.2027
at 02.00 P.M |
|
|
27 |
Case (T) No. 04 of 2018
Inland Power Limited
Vrs.
Jharkhand Bijli Vitran Nigam Limited |
Remanded from the Hon'ble APTEL in appeal no 402 of 2019 & IA No. 450 of 2025 & IA No. 450 of 2025 & IA No. 2061 of 2019 & IA No. 833 of 2020 |
08.01.2027
at 02.00 P.M |
|
|
28 |
Case(T) No.12 of 2019
Inland Power Limited |
Petition in respect of APTEL Order dated 19.03.2024 passed in APL No.125 of 2021 (Arising out of DFR No. 394/2020) for afresh consideration of the issues involved in the impugned Order dated 22.09.2020 passed in Case (Tariff) No. 12/2019 on True-up of FY 2018-19 for 1x63 MW Coal Fired CFBC Thermal Power Project under Section 61 & 62 of the Electricity Act 2003 |
08.01.2027
at 02.00 P.M |
|
|
29 |
Case No. 21 of 2026
M/s Karnpura Rice Mills
Vrs.
Jharkhand Urja Vikas Nigam Limited & Others |
Seeking approval to get fresh electrical connection for supply of power at 33 KV to the petitioner with a contrct demand of 750 KVA |
08.01.2027
at 02.00 P.M |
|
|
30 |
Review Case No.
29 of 2026 in Case (T) No. 12 of 2025
Damodar Valley Corporation
|
Review of order dated 30.03.2026 passed in Case (T) No 12 of 2025 for True up for FY 2024-25, APR for FY 2025-26, APR for MYT Period from FY 2026-27 to FY 2030-31 and determination of Tariff for FY 2026-27 |
08.01.2027
at 02.00 P.M |
|
|
31 |
Case (T) No. 06 of 2017
Inland Power Limited Vs. JBVNL (APTEL-Remanded- True-up 201-5-16) |
Hearing on Case (T) No. 06 of 2017 |
08.01.2027
at 02.00 P.M |
|
|
32 |
Review Case No. 32 of 2026
M/s Gajanan Ferro Pvt. Ltd. Vs. JBVNL |
Hearing on Review Case No 32 of 2026 |
08.01.2027
at 02.00 P.M |
|
|
33 |
Review Case No. 33 of 2026
M/s Ramkrishna Forgings Ltd. Vs. JBVNL |
Hearing on Review Case No. 33 of 2026 |
08.01.2027
at 02.00 P.M |
|
|
34 |
34 of 2026
M/s Rahul Toughened Industries LLP Vs. JBVNL & Anr. |
Hearing on Case No. 34 of 2026 |
08.01.2027
at 02.00 P.M |
|
|
35 |
Case No. 09 of 2024
Amalgam Steel & Power Limited (ASPL)
Vrs.
JREDA
|
For seekingdirection that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) from/for the year 2019-20 and 2020-21. |
29.01.2027
at 02.00 P.M |
|
|
36 |
Case No 10 of 2024
Amalgam Steel & Power Limited (ASPL)
Vrs.
JREDA |
For seeking direction that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) |
29.01.2027
at 02.00 P.M |
|
|
37 |
Case No. 22 of 2024
M/s ESL Steel Ltd. Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Exemption in compliance of Renewable Purchase Obligation for the period FY 2020-21 on the ground that the electricity produced from captive co- generating units of the petitioner is far in excess of its RPO requirements |
29.01.2027
at 02.00 P.M |
|
|
38 |
Case No. 23 of 2024
M/s ESL Steel Ltd. Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Exemption in compliance of Renewable Purchase Obligation for the period FY 2018-19 on the ground that the electricity produced from captive co- generating units of the petitioner is far in excess of its RPO requirements |
29.01.2027
at 02.00 P.M |
|
|
39 |
Case No. 24 of 2024
M/s ESL Steel Ltd. Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Exemption in compliance of Renewable Purchase Obligation for the period FY 2019-20 on the ground that the electricity produced from captive co- generating units of the petitioner is far in excess of its RPO requirements |
29.01.2027
at 02.00 P.M |
|
|
40 |
Case No. 09 of 2025
M/s Tata Steel Limited (TSL)
Vrs.
Jharkhand Renewable Energy Development Ageny (JREDA) |
Exemption/relaxation on compliance of Renewable Purchase Obligation considerging the fulfillment of RPO compliance are fully met with the electricity produced from Captive Co-generation unit of the petitoner is for in excess of its RPO requirements for the period 2021-22 |
29.01.2027
at 02.00 P.M |
|
|
41 |
Case No. 10 of 2025
M/s Tata Steel Limited (TSL)
Vrs.
Jharkhand Renewable Energy Development Ageny (JREDA) |
Exemption/relaxation on compliance of Renewable Purchase Obligation considerging the fulfillment of RPO compliance are fully met with the electricity produced from Captive Co-generation unit of the petitoner is for in excess of its RPO requirements for the period 2022-23 |
29.01.2027
at 02.00 P.M |
|
|
42 |
Case No. 11 of 2025
M/s Tata Steel Limited (TSL)
Vrs.
Jharkhand Renewable Energy Development Ageny (JREDA) |
Exemption/relaxation on compliance of Renewable Purchase Obligation considerging the fulfillment of RPO compliance are fully met with the electricity produced from Captive Co-generation unit of the petitoner is for in excess of its RPO requirements for the period 2023-24 |
29.01.2027
at 02.00 P.M |
|
|
43 |
Case No. 09 of 2024
Amalgam Steel & Power Limited (ASPL)
Vrs.
JREDA
|
For seekingdirection that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) from/for the year 2019-20 and 2020-21. |
29.01.2027
at 02.00 P.M |
|
|
44 |
Case No 10 of 2024
Amalgam Steel & Power Limited (ASPL)
Vrs.
JREDA |
For seeking direction that the Captive Power Plant of the petitioner be treated as co-generation power plant and also for relaxation/exemption in compliance of RPO on total installed capacity of 30 MW, since 15 MW out of 30 MW Capacity Generation of Power by Petitioner Company is generated thorugh its waste heat recovery boiler (WHRB) |
29.01.2027
at 02.00 P.M |
|
|
45 |
Case No. 22 of 2024
M/s ESL Steel Ltd. Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Exemption in compliance of Renewable Purchase Obligation for the period FY 2020-21 on the ground that the electricity produced from captive co- generating units of the petitioner is far in excess of its RPO requirements |
29.01.2027
at 02.00 P.M |
|
|
46 |
Case No. 23 of 2024
M/s ESL Steel Ltd. Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Exemption in compliance of Renewable Purchase Obligation for the period FY 2018-19 on the ground that the electricity produced from captive co- generating units of the petitioner is far in excess of its RPO requirements |
29.01.2027
at 02.00 P.M |
|
|
47 |
Case No. 24 of 2024
M/s ESL Steel Ltd. Vrs. Jharkhand Renewable Energy Development Agency (JREDA) |
Exemption in compliance of Renewable Purchase Obligation for the period FY 2019-20 on the ground that the electricity produced from captive co- generating units of the petitioner is far in excess of its RPO requirements |
29.01.2027
at 02.00 P.M |
|
|
48 |
Case No. 09 of 2025
M/s Tata Steel Limited (TSL)
Vrs.
Jharkhand Renewable Energy Development Ageny (JREDA) |
Exemption/relaxation on compliance of Renewable Purchase Obligation considerging the fulfillment of RPO compliance are fully met with the electricity produced from Captive Co-generation unit of the petitoner is for in excess of its RPO requirements for the period 2021-22 |
29.01.2027
at 02.00 P.M |
|
|
49 |
Case No. 10 of 2025
M/s Tata Steel Limited (TSL)
Vrs.
Jharkhand Renewable Energy Development Ageny (JREDA) |
Exemption/relaxation on compliance of Renewable Purchase Obligation considerging the fulfillment of RPO compliance are fully met with the electricity produced from Captive Co-generation unit of the petitoner is for in excess of its RPO requirements for the period 2022-23 |
29.01.2027
at 02.00 P.M |
|
|
50 |
Case No. 11 of 2025
M/s Tata Steel Limited (TSL)
Vrs.
Jharkhand Renewable Energy Development Ageny (JREDA) |
Exemption/relaxation on compliance of Renewable Purchase Obligation considerging the fulfillment of RPO compliance are fully met with the electricity produced from Captive Co-generation unit of the petitoner is for in excess of its RPO requirements for the period 2023-24 |
29.01.2027
at 02.00 P.M |
|
|
51 |
Miscellaneous Petition No. 04 of 2026
Remand Case (T) No. 05 of 2018 |
Seeking implementation of the Judgement dated 22.07.2026 passed by Hon'ble APTEL in Appeal No. 419 of 2022 arising out of Case (T) No. 05 of 2018 |
Order Reserved |
|